Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberESC06-01078
StatusFinaled
Name STEVE B DRESSER
Site Address 12055 W USTICK RD
Project NameLIFESTYLE CONDO SUB
Customer Number 
ePlanReview 
Description
1/31/07 Refer to ESC06-01078 as master ESC plan for Lifestyle Condominium project.adh.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled10/20/200910/20/200910/20/2009PPASS
DetailsClint A Smith
General Inspection9/15/20089/15/20089/15/2008PFAIL
DetailsClint A Smith
Need to clean up all sediment off of all hardsurfaces throughout the development.
Random Inspection7/14/20087/29/20087/29/2008APASS
DetailsJames Rogers
Landscaping company installing sprinkler system.
Site Preparation6/30/20087/15/20087/14/2008APASS
DetailsJames Rogers
Site Preparation6/23/20086/30/20086/30/2008APASS
DetailsJames Rogers
Random Inspection6/17/20086/24/20086/23/2008APASS
DetailsJames Rogers
Tracking Control6/11/20086/18/20086/18/2008AFAIL
DetailsJames Rogers
BMP Violation5/14/20086/14/20086/13/2008APART
DetailsClint A Smith
In the process of gading for vhydro seeding.
Gutterpans cleaned up.
CAS
#460
Random Inspection6/3/20086/11/20086/11/2008APASS
DetailsJames Rogers
General Inspection6/3/20086/4/20086/4/2008APART
DetailsClint A Smith
Have updated ECS info in computer and on the sign. Cleaning up the gutterpans throughout jobsite.
CAS
#460
Random Inspection6/3/20086/3/20086/3/2008PFAIL
DetailsClint A Smith
Notice of Correction
(left message with RP Steve Dresser)
1. Clean-up all sediment in gutterpans where paving has been completed.
2. Update ESC Sign and post it a entrance of project.
3. Update RP info with the city of Boise.
Will re-inspect on 6/4/08.
CAS
#460
Site Preparation6/3/20086/17/20086/3/2008APART
DetailsJames Rogers
RP Steve Dresser is listed as ###-####. Site re-grading is taking place.
BMP Violation5/1/20085/22/20085/22/2008ACANC
DetailsClint A Smith
met with RP and he gave me the schedule for all work on stabilizing the project and clean up of the project. It will work.
CAS
#460
Conference5/15/20085/15/20085/15/2008ADONE
DetailsClint A Smith
Discussed with the RP over getting the RP info updated withthe city. Clean up gutter pans, and get protection on exsisting D.I. that have not been protected yet.
CAS
#460
Conference5/14/20085/14/20085/15/2008ACANC
DetailsClint A Smith
Wrong date
General Inspection5/14/20085/14/20085/14/2008PFAIL
DetailsEric Strole
cannot get ahold of rp & or developer. need to clean up gutters & protect stormdrains, also see clints last inspection notes.
Site Preparation5/14/20085/14/20085/14/2008PCANC
DetailsEric Strole
BMP Violation5/1/20085/1/20085/1/2008AFAIL
DetailsClint A Smith
Notice of Correction
Stbilize all disturbed bare soil on all of the Project Area.
Spoke with RP over the situation.
Will re-inspect on 5/22/08
CAS
#460
BMP Violation4/16/20084/16/20084/17/2008AFAIL
DetailsClint A Smith
Need to stabilize all disurbed soil. Left message with the Project Owner.
CAS
#460
Site Preparation4/8/20084/15/20084/14/2008ACANC
DetailsJames Rogers
Check for site stabilization
Random Inspection4/8/20084/8/20084/8/2008PFAIL
DetailsJames Rogers
Site BMP's in place, but no long term stabilization in place to control dust or site erosion.
Tracking Control8/28/20069/11/20069/12/2006ACANC
DetailsAimee Hughes
Complaint Inspection8/28/20068/28/20068/28/2006PPART
DetailsAimee Hughes
Met with RP to discuss citizen complaint regarding dust on site due to excavation. Water trucks are being run regularly and all other bmp's are place. Suggested to RP that water trucks be run an hour or two before work starts for the day. Directed complainant to DEQ and will re-inpsect.
Tracking Control7/26/20067/27/20067/27/2006ACANC
DetailsAimee Hughes
Tracking Control7/10/20067/24/20067/26/2006ACANC
DetailsAimee Hughes
Site Preparation7/10/20067/12/20067/12/2006PDONE
DetailsSteven Webb
Did not observe any construction activities have been started. NO bmp's or signage observed either.
Conference7/7/20067/10/20067/10/2006APASS
DetailsAimee Hughes
Met with RP, developer, and owner to walk site and discuss bmp installation and dewatering issues during construction phase. Informed owner of responsibilities and permit requirements. Will inspect again once construction is underway.
Conference7/7/20067/10/20067/10/2006ADONE
DetailsSteven Webb
Site walk with contractor?RP--Tom ###-####. Install bmp's per approved plan and verbal comments at job walk.