Site Final | 10/30/2007 | 10/30/2007 | 10/30/2007 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 10/19/2006 | 11/16/2006 | 11/17/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
Tracking Control | 9/28/2006 | 10/19/2006 | 10/19/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good, all bmp's are being maintained.
|
Tracking Control | 9/5/2006 | 9/26/2006 | 9/28/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good, all bmp's are being maintained.
|
BMP Violation | 8/22/2006 | 9/5/2006 | 9/5/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
BMP Violation | 8/22/2006 | 8/22/2006 | 8/22/2006 | P | FAIL |
Aimee Hughes
|
|
|
c/n issued to address sediment barrier needed along front of property, trash container needed on site, approved set of ESC plans needed on site, and sediment on sidewalk and in gutters needs to be cleaned and maintained. Talked to RP, issues will be addressed today.
|
Complaint Inspection | 8/21/2006 | 8/21/2006 | 8/22/2006 | P | FAIL |
Aimee Hughes
|
|
|
Complaint follow up from yesterday.
|
BMP Violation | 8/21/2006 | 8/22/2006 | 8/22/2006 | A | FAIL |
Aimee Hughes
|
|
|
Complaint from yesterday. Approved plan to be implemented, including downhill drop inlet protection, etc or a written correction will be issued. REFER TO HISTORY.
|
BMP Violation | 8/21/2006 | 8/21/2006 | 8/21/2006 | P | FAIL |
Steven Webb
|
|
|
T. Young, informed SGW that concrete was released inside curb, pump truck operator had unfavorable response to inquiry. RP was notified of concrete release. RP to implement plan including downslope drop inlet protection and other approved plan provisions.
|