Site Final | 7/27/2007 | 7/27/2007 | 7/27/2007 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 11/27/2006 | 12/13/2006 | 12/14/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks okay.
|
Tracking Control | 10/30/2006 | 11/21/2006 | 11/27/2006 | A | PASS |
Aimee Hughes
|
|
|
Site looks good.
|
Site Preparation | 10/9/2006 | 10/30/2006 | 10/30/2006 | A | FAIL |
Aimee Hughes
|
|
|
verbal c/n to RP, trash, papers, and wrappers are blowing around on his site. recommended that he put some type of cover on his trash container to prevent this from continuing to be a problem.
|
Tracking Control | 10/9/2006 | 10/9/2006 | 10/9/2006 | P | PART |
Aimee Hughes
|
|
|
Talked to RP about some minimal trackout from and site and reposting ESC sign.
|
Tracking Control | 9/19/2006 | 9/19/2006 | 9/19/2006 | P | PASS |
Aimee Hughes
|
|
|
Called all RP's in subdivision to remind them to make sure all bmp's are in place and being maintained. Some minimal trackout needs to be addressed and some ESC signs need to be posted.
|