Site Final | 12/10/2007 | 12/10/2007 | 12/10/2007 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Complaint Inspection | 3/1/2007 | 3/2/2007 | 3/2/2007 | A | PASS |
Aimee Hughes
|
|
|
Issues on c/n have been addressed.
|
Complaint Inspection | 3/1/2007 | 3/1/2007 | 3/1/2007 | P | FAIL |
Aimee Hughes
|
|
|
c/n issued to RP to address trackout on sidewalks and in street. site must be cleaned up by the end of the day today or a stop work will be issued. I will re-inspect on 3-2-07.
|
BMP Violation | 1/10/2007 | 1/12/2007 | 1/16/2007 | A | PASS |
Aimee Hughes
|
|
|
issues on c/n have been addressed. Reminded RP to continue maintaining track out on a regular basis.
|
BMP Violation | 1/10/2007 | 1/10/2007 | 1/10/2007 | P | FAIL |
Aimee Hughes
|
|
|
c/n issued to address heavy trackout on sidewalks, street, and gutters. Notifed RP, site must be cleaned up by 1-12-07 and reinspection will be done.
|
BMP Violation | 11/6/2006 | 11/7/2006 | 11/7/2006 | P | PART |
Aimee Hughes
|
|
|
Received call from RP, sweeper is scheduled for tomorrow morning. Sidewalks, street and gutter will be hand swept today before sweeper comes.
|
BMP Violation | 11/6/2006 | 11/6/2006 | 11/6/2006 | P | FAIL |
Aimee Hughes
|
|
|
c/n issued to address heavy trackout on sidewalks and Latah. contacted RP and asked that construction entrance be installed of measures taken to prevent further problems. must be completed by noon tomorrow.
|