Site Final | 5/9/2007 | 5/9/2007 | 5/9/2007 | P | PASS |
Aimee Hughes
|
|
|
Final stabilization has been completed.
|
Tracking Control | 11/27/2006 | 11/28/2006 | 12/4/2006 | P | PASS |
Steven Webb
|
|
|
Re-inspection. Re-inspection items completed.
|
Site Preparation | 11/27/2006 | 11/27/2006 | 11/27/2006 | A | FAIL |
Steven Webb
|
|
|
Correction to Kelly (RP). Post sign, sweep hard surface, drop inlet bag on D.I on Boise Avenue. Complete by the end of the day. Will follow up.
|