Permit Information
Permit NumberESC07-00003
StatusFinaled
Name BRIAN D HETMER
Site Address 805 S SHOSHONE ST
Project NameSOUTH JUNIOR HIGH SCHOOL
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final4/14/20094/14/20094/14/2009PPASS
DetailsTom Arcoraci
all landscape and revegatation complete
DOC - Permit Finaled4/14/20094/14/20094/14/2009PPASS
DetailsTom Arcoraci
General Inspection3/6/20093/6/20093/6/2009PPASS
DetailsBob Reichert
looked ok
General Inspection2/12/20092/12/20092/12/2009APASS
DetailsPat Lass
looks ok
General Inspection1/23/20091/23/20091/23/2009PDONE
DetailsBob Reichert
too much snow to see
Random Inspection1/2/20091/2/20091/2/2009PPART
DetailsSteven Webb
Verbal to rp via voice mail. Cleanup on sidewalks is needed. Contractors need to containeize trash so it is not blowing off site. Need to post sign and perform general sediment cleanup.
General Inspection12/23/200812/23/200812/23/2008APASS
DetailsBob Reichert
looked ok
Tracking Control11/28/200812/1/200812/1/2008APART
DetailsClint A Smith
Told Rp that they need to clean up the entrance into the parking lot by the end of the day and there intial clean up from last week was a good effort.
Tracking Control11/26/200811/28/200811/28/2008APART
DetailsClint A Smith
Need to clean up entrance into the school a little bit better. Will re-inspect on 12/1/08
Complaint Inspection11/26/200811/26/200811/26/2008AFAIL
DetailsClint A Smith
Need to clean up all tracking within the parking lot and onto the street area. Also protect the spoil pile of dirt within the parking lot.
Tracking Control10/16/200810/17/200810/17/2008PPASS
DetailsClint A Smith
Tracking Control10/16/200810/16/200810/16/2008AFAIL
DetailsClint A Smith
Need to clean up all sediemnt and debris off of Shoshone street. Also relocate there concrete washout area due to it being so close to the storm drain inlet. Will re-inspect on 10/17/08 PM.
General Inspection10/8/200810/8/200810/8/2008PPASS
DetailsBob Reichert
looked ok
General Inspection10/1/200810/1/200810/1/2008APASS
DetailsClint A Smith
General Inspection9/29/20089/29/20089/29/2008PPART
DetailsBob Reichert
looked ok
Tracking Control9/8/20089/8/20089/8/2008PCANC
DetailsClint A Smith
Entrance installed and tracking being cleaned up.
CAS
Tracking Control9/8/20089/8/20089/8/2008AFAIL
DetailsClint A Smith
Verbal Notice.
Told RP of the issues pertaining with the project.
1. Tracking all along Shoshone st. Need to come up with a better access plan for the site.
2. Clean up all tracking off of project by this afternoon.
Will re-inspect today by 5pm.
CAS
General Inspection8/27/20088/27/20088/27/2008PPART
DetailsBob Reichert
looked ok
Random Inspection7/31/20087/31/20087/31/2008PPART
DetailsTom Arcoraci
meet with rp reminded him of previous visit by steve webb to control dust at demo
Complaint Inspection7/29/20087/29/20087/29/2008APASS
DetailsSteven Webb
Complaint regarding demo dust: Contractor is misting and spraying with fire hose, making "reasonable efforts"
General Inspection7/28/20087/28/20087/28/2008APASS
DetailsMike Kinnear
sign posted site looks fine
General Inspection7/22/20087/22/20087/22/2008APASS
DetailsBob Reichert
looked ok
General Inspection7/17/20087/17/20087/17/2008APASS
DetailsMike Kinnear
sign posted site looks fine
General Inspection7/11/20087/11/20087/11/2008PPASS
DetailsMike Kinnear
sign posted sign looks fine
General Inspection7/9/20087/9/20087/9/2008APART
DetailsMike Kinnear
sign posted & site looked fine they started demo on old building
General Inspection7/2/20087/2/20087/2/2008PPASS
DetailsBob Reichert
looked ok
Site Preparation6/24/20087/1/20087/2/2008APASS
DetailsJames Rogers
Tracking Control6/24/20086/27/20086/27/2008APART
DetailsClint A Smith
Thet have addressed the tracking issues. Due to the phase of construction they will have a sweeper coming at the end of the dsay for any sediment on the road.
CAS
460
Random Inspection6/17/20086/24/20086/24/2008AFAIL
DetailsJames Rogers
1. Mud and dirt trackout from construction site entrance on Shoshone.
2. Dirt on sidewalk on Edson and Cassia.
Cleanup of trackout from construction entrance on
Shosone by close of business 6-24-08.
Install BMP at Construction entrance
Cleanup of dirt on sidewalk, gutter on edson, cassia and shoshone by end of day, 6-24-08 or a stop work may be issued.
General Inspection6/18/20086/18/20086/18/2008PPASS
DetailsBob Reichert
looked ok
General Inspection6/12/20086/16/20086/17/2008APASS
DetailsJames Rogers
Tracking Control6/11/20086/16/20086/16/2008APASS
DetailsJames Rogers
General Inspection6/11/20086/12/20086/12/2008APART
DetailsSteven Webb
Follow up: Construction entrance in place on east side of building. Lack of access control on west side of project, vehicle traffic observed going over the curb where no cons. entrance is located. Informed RP that acess control is needed, (fencing and steel posts). Also informed RP that designated mortal washout area is also required. Additional inspection will be performed by J. Rogers on Monday a.m.
Tracking Control5/30/20086/10/20086/11/2008AFAIL
DetailsJames Rogers
CN Issued.
1. Excessive track out ontoEdson & Cassia Street from Construction Site Entrance. Sidewalk, streets (Edson & Cassia) shall be cleaned of mud and dirt trackout.
2. Construction site entrance to b e repaired and resurfaced with clean rock meeting BMP requirements.
3. No adequate parking area provided for employees or contractor personnel that meets erosion control requirements.

Deficiencies to be corrected by close of business 6-13 or a stop work order will be issued.
Conference6/11/20086/11/20086/11/2008ADONE
DetailsSteven Webb
Talked to Anna at CM Office regarding lack of erosion controls regarding trackout. Due to minimal construction entrance excessive trackout has been occuring. Street sweeeping cannot be the primary control to reduce trackout since soil moisture content is high and high numbers of vehicles are entering and exiting the work site. Will follow up
General Inspection6/6/20086/6/20086/6/2008PPART
DetailsBob Reichert
looked ok
Site Preparation5/12/20085/28/20085/30/2008APASS
DetailsJames Rogers
General Inspection5/23/20085/23/20085/23/2008PPASS
DetailsBob Reichert
looked ok
Random Inspection5/5/20085/12/20085/12/2008APASS
DetailsJames Rogers
Tracking Control4/23/20084/30/20085/5/2008PPASS
DetailsJames Rogers
Site Preparation4/14/20084/23/20084/23/2008APASS
DetailsJames Rogers
Some minor trackout.
Site Preparation4/7/20084/14/20084/14/2008ACANC
DetailsJames Rogers
Dust control on site and on Edison
Tracking Control4/7/20084/14/20084/14/2008APASS
DetailsJames Rogers
Receiving dust control complaints from excessive dirt on edison. Street has been swept.
Tracking Control4/1/20084/8/20084/7/2008AFAIL
DetailsJames Rogers
Excessive dirt on Edison is causing neighboorhood complaints. Left correction notice directing clean up on Edison and dust control on construction site to be implemented.
Complaint Inspection4/2/20084/1/20084/1/2008AFAIL
DetailsJames Rogers
Excessive dirt on Edson and Cassia St. Left correction notice directing RP Brain Hetmen (###-####) to implement sweeping BMP's on Edson from const. site entrance to Cassia and sweeping control on construction site entrances on Cassia. Also to implement site dust controls.
Random Inspection3/6/20083/6/20083/6/2008APART
DetailsClint A Smith
Tracking Control2/26/20082/26/20082/26/2008PPASS
DetailsClint A Smith
They have brought in new washed rock to do a topping on the construction entrance. Plus crew is cleaning up any tracking.
CAS#460
###-####
Random Inspection2/25/20082/25/20082/25/2008PPART
DetailsClint A Smith
Dabout tracking discussed with RP (Brian H.) with the tracking issue. Explained to him he must re-stabilize his entrance and construction area. They have a street sweeper M-F coming 5:15pm every day to clean-up. Will reinspect tomorrow to see clean up. Wil give him until next Monday to re-stabile the entrance and parking area if he can stay on top of clean up.

CAS#460
###-####
Random Inspection6/25/20076/25/20076/25/2007APART
DetailsSteven Webb
Random Inspection6/25/20076/25/20076/25/2007ACANC
DetailsSteven Webb
Things look rather good, designated concrete washout area, composted wattle at perimeter, needs top dressing at constructio entrance.