Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberESC07-00071
StatusFinaled
Name MIKE SHAIN
Site Address 6411 W FAIRFIELD AVE
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final6/24/20096/24/20096/24/2009APASS
DetailsTom Arcoraci
DOC - Permit Finaled6/24/20096/24/20096/24/2009PPASS
DetailsTom Arcoraci
Random Inspection4/24/20094/24/20094/24/2009PPASS
DetailsTom Arcoraci
Site Preparation4/24/20094/24/20094/24/2009PCANC
DetailsTom Arcoraci
General Inspection10/21/200810/21/200810/21/2008APASS
DetailsClint A Smith
Site looks good. No issues present.
General Inspection9/17/20089/17/20089/17/2008APART
DetailsBob Reichert
looked ok
Random Inspection8/27/20088/27/20088/27/2008AFAIL
DetailsClint A Smith
Need to clean up tracking off of the entrance into the project. Need to provide a concrete washout pit. Also use an alternate drain inlet protect that is above ground than an inside inlet protection. Will re-inspect on 8/29/08
CAS
General Inspection8/8/20088/8/20088/8/2008PPASS
DetailsClint A Smith
No issues present.
Tracking Control7/28/20087/31/20087/31/2008APASS
DetailsClint A Smith
Entrance installed correctly. And tracking is cleaned up.
CAS
Complaint Inspection7/30/20087/30/20087/30/2008PFAIL
DetailsJames Rogers
Received complaint from neighbor concerning site dust control. Discussed dust control with Mike. He said they would talk to equipment operators about on site speed and make more effort to control dust.
Tracking Control7/28/20087/28/20087/28/2008AFAIL
DetailsClint A Smith
Need to install a proper construction entrance onto Sage st. Also need to install D. I. protection in storm drains where sediment poses a threat. Will re-inspect on the entrance and tracking issue on 7/31/08
CAS
Site Final6/30/20087/8/20087/9/2008APASS
DetailsJames Rogers
Random Inspection6/18/20086/25/20086/30/2008APASS
DetailsJames Rogers
Tracking Control6/11/20086/18/20086/18/2008APASS
DetailsJames Rogers
Tracking Control6/3/20086/10/20086/11/2008APASS
DetailsJames Rogers
Site Preparation5/29/20086/4/20086/3/2008APASS
DetailsJames Rogers
Random Inspection5/12/20085/28/20085/29/2008APASS
DetailsJames Rogers
General Inspection5/16/20085/16/20085/16/2008APASS
DetailsBob Reichert
grounds look ok
Site Preparation5/5/20085/12/20085/12/2008APASS
DetailsJames Rogers
Tracking Control4/29/20085/6/20085/5/2008APASS
DetailsJames Rogers
BMP Violation4/22/20084/28/20084/29/2008APASS
DetailsJames Rogers
See previous CN
BMP Violation4/22/20084/22/20084/22/2008PCANC
DetailsJames Rogers
See previous notes.
BMP Violation4/22/20084/22/20084/22/2008PFAIL
DetailsJames Rogers
1. Gutters, sidewalks, and site entrances on W. Holiday, W. Fairfield & S.Albright to be swept and maintained clean.
2. No perim controls in place.
3. Disturbed areas to have temp soil stabilization in place.
4. Dust control to be utilized on stockpiles and internal parking areas.

Discussed issued with Mike Shain.