Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberESC07-00394
StatusExpired
Name JUSTIN HUBBLE
Site Address 7400 N GARY LN
Project NamePHANTOM CREEK SUBDIVISION
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired10/17/201110/17/201110/17/2011APASS
DetailsDaryl Spivey
no activity
Aging Inspection10/17/201110/17/201110/17/2011 PASS
DetailsDaryl Spivey
Aging Inspection8/15/20118/15/20118/15/2011 PART
DetailsClint A Smith
Vertical construction is still occuring inthe vacent lots.
Aging Inspection6/13/20116/13/20116/13/2011 PART
DetailsTony Young
weeds are in reveg process...
Aging Inspection4/11/20114/11/20114/11/2011 CANC
DetailsClint A Smith
Aging Inspection2/7/20112/7/20112/7/2011 PASS
DetailsDaryl Spivey
area clean
Aging Inspection11/15/201011/15/201011/15/2010 PASS
DetailsClint A Smith
No activity at this time. Possibly will be active in the near future.
Aging Inspection9/15/20109/15/20109/15/2010 PASS
DetailsDaryl Spivey
Random Inspection7/15/20107/15/20107/15/2010PPASS
DetailsDaryl Spivey
Subdivision approximately 40 per cent built on...........bmp's in place and site is clean of debris................ds
Aging Inspection7/14/20107/14/20107/15/2010 PASS
DetailsDaryl Spivey
scheduled a random inspection..........ds
Aging Inspection5/14/20105/14/20105/17/2010PPASS
DetailsClint A Smith
still activlly building.
Aging Inspection5/14/20105/14/20105/14/2010 PEND
DetailsDixie Fellows
SENT TO CLINT
General Inspection10/2/200810/3/200810/3/2008PPART
DetailsClint A Smith
Told RP to update the phone number with the city.
General Inspection10/2/200810/3/200810/2/2008ACANC
DetailsEric Strole
General Inspection9/30/200810/2/200810/2/2008PFAIL
DetailsEric Strole
left correction with rp to clean out di boxes, dirt on all hard surfaces & rp still has not repaired silt fence and or waddles. will reinspect on friday 10-3-08 pm
Random Inspection9/30/20089/30/20089/30/2008PPART
DetailsEric Strole
left verbal correction with rp to finish installing waddles or repair silt fench by thursday afternoon 10-2-08
BMP Violation4/11/20084/11/20084/11/2008PFAIL
DetailsClint A Smith
Notice of Correction
To stabilize disturded soil if it set for 30 days or more. Explained to the RP over the situation.
Will Re-inspect on 5/11/07
CAS#460
Site Preparation4/11/20084/11/20084/11/2008PCANC
DetailsClint A Smith
Random Inspection3/3/20083/3/20083/3/2008PPART
DetailsClint A Smith
Siltfence installed on partial of lot. Recommended extending it in section that can be a potential concern. North side of project is a slope that is greater than 2' to 1'. Was told by RP that will be sprayed with a tactifier and native seed will be applied.
Also instructed to up date Erosion control Map of any changes due to phase of project.
Will re-inspect on Friday the 3/7/08
CAS#460
###-####
Complaint Inspection1/7/20081/8/20081/8/2008PFAIL
DetailsSteven Webb
Discussion with RP regarding compliance to ESC permit. Includes general erosion & sediment controls. Sign posted and filled out?
Complaint Inspection1/7/20081/7/20081/8/2008PPART
DetailsSteven Webb
Contacted RP to address compliant. Wil follow up