Site Final | 3/27/2009 | 3/27/2009 | 3/27/2009 | P | PASS |
Bill VanDegrift
|
|
|
complete
|
BMP Violation | 7/26/2007 | 7/27/2007 | 7/27/2007 | A | PART |
Aimee Hughes
|
|
|
Issues on c/n have been addressed. ESC sign is posted, d/i is protected and trash container is on site. left vm for RP to make sure that the hard surfaces are swept at the end of the day, there is a lot of dirt work going on today.
|
BMP Violation | 7/26/2007 | 7/26/2007 | 7/26/2007 | A | FAIL |
Steven Webb
|
|
|
ESC plan not implemented complete all items prior to work, protect d.i, dust, pariemtner, trash container, signage etc.
|
Random Inspection | 7/26/2007 | 7/26/2007 | 7/26/2007 | A | CANC |
Steven Webb
|
|
|
Verbal to RP Keith at Dave Evans; Plans requirements not completly installed on job, unprotected drop inlet where truck are being loaded, dirt 15 feet on hardsurfaces beyond curb, Oil dripping onto hard surface, no trash container, unmaintained silt fence, no signage nor perimeter sediment barriers. Complete ASAP (today) or further enforcement will occur.
|