Site Final | 4/16/2008 | 4/16/2008 | 4/16/2008 | A | PASS |
Clint A Smith
|
|
|
Final landscaping has been installed. CAS #460
|
BMP Violation | 3/6/2008 | 3/7/2008 | 3/7/2008 | A | PART |
Clint A Smith
|
|
|
Site celaned up but silt fence needs to be trenched in. Overall site looks better. Discussed with RP over the other minor issues. CAS#460 ###-####
|
BMP Violation | 3/4/2008 | 3/4/2008 | 3/4/2008 | P | FAIL |
Clint A Smith
|
|
|
**Notice of Correction** -Heavy sediment tracking on Garverdale and Wildwood -Trash debris not in container around lots -No Sediment BMP's inplace -No construction entrance to lots -No concrete washout pit Failure to comply by 3/7/08 will result in a stop work order. Will re-inspect on 3/7/08 CAS#460 ###-####
|