Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberESC07-01112
StatusFinaled
Name ERIC STORKSON
Site Address 4843 N SETTLERS RIDGE PL
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final3/13/20093/13/20093/13/2009PPASS
DetailsTony Young
DOC - Permit Finaled3/13/20093/13/20093/13/2009PPASS
DetailsTony Young
Random Inspection3/10/20093/10/20093/10/2009PPASS
DetailsDixie Fellows
site clean
General Inspection2/10/20092/10/20092/10/2009APASS
DetailsPat Lass
looks ok
Random Inspection2/6/20092/6/20092/6/2009PPASS
DetailsDaryl Spivey
site clean...........ds
Random Inspection1/22/20091/22/20091/22/2009APASS
DetailsDaryl Spivey
Site is clean
General Inspection1/20/20091/20/20091/20/2009APASS
DetailsPat Lass
looks ok
General Inspection11/4/200811/4/200811/4/2008APASS
DetailsPat Lass
site looks ok
General Inspection10/31/200810/31/200810/31/2008APASS
DetailsPat Lass
site was clean
BMP Violation10/23/200810/27/200810/28/2008PPASS
DetailsEric Strole
corrections are complete.
Random Inspection10/23/200810/23/200810/23/2008AFAIL
DetailsDixie Fellows
left c/n and eric called rp and left a message they have until mon pm to take care of c/n
Random Inspection10/23/200810/23/200810/23/2008AFAIL
DetailsEric Strole
meet with dixie to check this job-left verbal correction on voicemail of rp to repair all silt fence & waddles on site where over 2 percent grade (front, back & right side of site) clean all dirt & debris off all hard surfaces. remove concrete from site since there is no concrete washout pit & clean up small amount of trash & put in a container.also left correction notice on site. dixie or eric will reinspect 10-27-08 pm.
BMP Violation8/19/20088/21/20088/22/2008PPASS
DetailsClint A Smith
BMP Violation8/13/20088/19/20088/19/2008ADEFR
DetailsClint A Smith
Moved to site final.
BMP Violation8/13/20088/13/20088/13/2008PFAIL
DetailsClint A Smith
Left a message with the RP. Need to maintain sediment BMP's along the front of lot. Clean gutter pas infront of lot. Pick up trash debris through out the lot. Install additional silt fenc on the north east side of the lot where the slope is disturbed and no protection from erosion is at. Will re-inspect on 8/19/008
CAS
General Inspection6/26/20086/26/20086/26/2008APART
DetailsEric Strole
left verbal correction on rp's phone meassage that when waterline is backfilled to clean up tracking in road & sidewalk & reinstall waddles.
Random Inspection5/19/20085/19/20085/19/2008APASS
DetailsPat Lass
BMP Violation5/14/20085/16/20085/16/2008PPASS
DetailsClint A Smith
All issues corrected.
CAS
#460
Random Inspection5/14/20085/14/20085/14/2008AFAIL
DetailsClint A Smith
Need to install siltfence to manufacturs specs. It is not trenched in.
Gave a verbal correction to the project manager
Will re-inspect on 5/16/08
CAS
General Inspection5/5/20085/5/20085/5/2008PPASS
DetailsEric Strole
BMPs in order.
Tracking Control11/13/200711/13/200711/13/2007PPART
DetailsAimee Hughes
Met with owner to discuss stabilization schedule for back slope. Site looks okay, some minimal trackout needs addressed.
Tracking Control10/30/200711/8/200711/7/2007APART
DetailsAimee Hughes
Talked to RP about status of project. More backfilling is being completed this week and all trackout is being maintained.
Conference10/25/200710/29/200710/30/2007PFAIL
DetailsAimee Hughes
Met with Jennifer Koranda and Erik Storkson (Interim RP) to discuss slope stabilization schedule and measures. Backfilling should be completed by the end of the week and slope will be compacted for retaining wall construction. Stock piled soils will be used for backfilling, no soil is being removed from the site. Also discussed final stabilization schedule and other bmp's on site. c/n issued to address violations. I will reinspect site next week.
Conference10/26/200710/29/200710/29/2007PFAIL
DetailsSteven Webb
1:30: No access
Complaint Inspection10/9/200710/10/200710/10/2007ACANC
DetailsAimee Hughes
Complaint Inspection10/9/200710/9/200710/9/2007PFAIL
DetailsAimee Hughes
Responded to citizen complaint regarding dirt on back of site and erosion concerns. Visited site and will set up conference with RP to discuss issues and inspect site to approved ESC plan.