Site Final | 10/21/2008 | 10/21/2008 | 10/21/2008 | P | PASS |
Clint A Smith
|
|
|
All work is completed.
|
General Inspection | 6/4/2008 | 6/4/2008 | 6/4/2008 | P | PASS |
Eric Strole
|
|
|
bmp's in order
|
Random Inspection | 6/3/2008 | 6/3/2008 | 6/3/2008 | P | PART |
Jack Frank
|
|
|
site look ok gruond stablized drainage ditch and pond looks good
|
General Inspection | 5/9/2008 | 5/9/2008 | 5/9/2008 | A | PASS |
Clint A Smith
|
|
|
Site looks good. Track walking slope and getting ready to spray it with a native seed and tackifier. Will recieve a call with they have met final stabilization. CAS #460
|
Site Preparation | 12/16/2007 | 12/17/2007 | 12/16/2007 | A | PASS |
Aimee Hughes
|
|
|
Received call from RP regarding 48 hr. notice. Bmp's are in place and construction is set to begin. Visited site on 12-14-07 to make sure that all bmp's were in place.
|
Site Preparation | 12/16/2007 | 12/16/2007 | 12/16/2007 | P | CANC |
Aimee Hughes
|
|
|
|
Site Preparation | 12/5/2007 | 12/5/2007 | 12/5/2007 | A | NR |
Steven Webb
|
|
|
Work has not started. Talked to contractor. Informed him that prior to start of construction that the City of Boise will need to be notified. A site preparation inspection will be required.
|