Site Final | 7/7/2008 | 7/7/2008 | 7/7/2008 | P | PASS |
Steven Webb
|
|
|
|
Random Inspection | 6/5/2008 | 6/5/2008 | 6/5/2008 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 6/3/2008 | 6/3/2008 | 6/3/2008 | P | DONE |
Mike Kinnear
|
|
|
clint finaled permit 6/2/08
|
Site Preparation | 6/2/2008 | 6/2/2008 | 6/2/2008 | P | CANC |
Clint A Smith
|
|
|
|
Site Final | 6/2/2008 | 6/2/2008 | 6/2/2008 | P | PASS |
Clint A Smith
|
|
|
All landscaping is complete on project. PASS CAS #460
|
General Inspection | 5/28/2008 | 5/28/2008 | 5/28/2008 | P | PASS |
Mike Kinnear
|
|
|
parking lot paved esc card posted & trash been put in dumpster
|
Random Inspection | 5/28/2008 | 5/28/2008 | 5/28/2008 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 5/22/2008 | 5/22/2008 | 5/22/2008 | A | PASS |
Jim Storey
|
|
|
|
Tracking Control | 2/27/2008 | 2/29/2008 | 2/29/2008 | A | FAIL |
Clint A Smith
|
|
|
**Notice Of Correction** 1. Tracking still occuring. Entrance is not long enough. Will re-inspect on Tuesday the 5th of March CAS#460 ###-####
|
Tracking Control | 2/27/2008 | 2/27/2008 | 2/27/2008 | P | PART |
Clint A Smith
|
|
|
Tracking coming off of project onto Garfield and Denver. Pat (rp) said a street sweeper will be coming through tonight for clean up. Also recommended expanding construction entrance and having all construction workers to park in the parking lot of the church next store. Will re-inspect the 29th of feb. 08 CAS#460 ###-####
|
Random Inspection | 2/11/2008 | 2/12/2008 | 2/12/2008 | P | PART |
Clint A Smith
|
|
|
Inspected with SGW. Instructed Contractor to install either silt fence or wattle per manufacturers specs. Also to ammend plans if silt fence is not going to be used. Will re-inspect on 2/15/08 at 12pm.
CAS SGW
|
Site Preparation | 2/11/2008 | 2/12/2008 | 2/11/2008 | P | CANC |
Clint A Smith
|
|
|
Check out entrance and also BMP's
|
Random Inspection | 2/11/2008 | 2/11/2008 | 2/11/2008 | P | PART |
Clint A Smith
|
|
|
Verbal correction notice. Clean up tracking out of project onto W. Garfield. Also Maintenance required on the construction entrance.
|
Site Preparation | 12/6/2007 | 12/7/2007 | 12/7/2007 | P | PART |
Aimee Hughes
|
|
|
Spoke with RP about adding some top dressing to the existing construction entrance and to address some mud and dirt trackout from site onto Garfield. Perimeter control is in place, ESC sign is posted and port a potty is on site. Clean up and top dressing will be addressed today.
|