Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberESC07-01185
StatusFinaled
Name J C MURRAY
Site Address 1907 S BROADWAY AVE
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final7/7/20087/7/20087/7/2008PPASS
DetailsSteven Webb
Random Inspection6/5/20086/5/20086/5/2008PPASS
DetailsJim Storey
General Inspection6/3/20086/3/20086/3/2008PDONE
DetailsMike Kinnear
clint finaled permit 6/2/08
Site Preparation6/2/20086/2/20086/2/2008PCANC
DetailsClint A Smith
Site Final6/2/20086/2/20086/2/2008PPASS
DetailsClint A Smith
All landscaping is complete on project.
PASS
CAS
#460
General Inspection5/28/20085/28/20085/28/2008PPASS
DetailsMike Kinnear
parking lot paved esc card posted & trash been put in dumpster
Random Inspection5/28/20085/28/20085/28/2008PPASS
DetailsJim Storey
Random Inspection5/22/20085/22/20085/22/2008APASS
DetailsJim Storey
Tracking Control2/27/20082/29/20082/29/2008AFAIL
DetailsClint A Smith
**Notice Of Correction**
1. Tracking still occuring. Entrance is not long enough.
Will re-inspect on Tuesday the 5th of March
CAS#460
###-####
Tracking Control2/27/20082/27/20082/27/2008PPART
DetailsClint A Smith
Tracking coming off of project onto Garfield and Denver. Pat (rp) said a street sweeper will be coming through tonight for clean up. Also recommended expanding construction entrance and having all construction workers to park in the parking lot of the church next store. Will re-inspect the 29th of feb. 08
CAS#460
###-####
Random Inspection2/11/20082/12/20082/12/2008PPART
DetailsClint A Smith
Inspected with SGW. Instructed Contractor to install either silt fence or wattle per manufacturers specs. Also to ammend plans if silt fence is not going to be used.
Will re-inspect on 2/15/08 at 12pm.

CAS
SGW
Site Preparation2/11/20082/12/20082/11/2008PCANC
DetailsClint A Smith
Check out entrance and also BMP's
Random Inspection2/11/20082/11/20082/11/2008PPART
DetailsClint A Smith
Verbal correction notice.
Clean up tracking out of project onto W. Garfield. Also Maintenance required on the construction entrance.
Site Preparation12/6/200712/7/200712/7/2007PPART
DetailsAimee Hughes
Spoke with RP about adding some top dressing to the existing construction entrance and to address some mud and dirt trackout from site onto Garfield. Perimeter control is in place, ESC sign is posted and port a potty is on site. Clean up and top dressing will be addressed today.