Site Final | 6/11/2008 | 6/11/2008 | 6/11/2008 | P | PASS |
Clint A Smith
|
|
|
All final landscaping has been installed. Hydro seeding on all disturbed areas at the front of project and also in the back of project has been completed. PASS CAS #460
|
Random Inspection | 5/30/2008 | 5/30/2008 | 5/30/2008 | P | PART |
William E Thomas
|
|
|
. .1. sign posted. . . . .2. talked to rp about debris and dirt in gutters. . . . .3. rp informed me a street sweeper has been orderd and scheduled for this afternoon. . .
|
Random Inspection | 5/19/2008 | 5/19/2008 | 5/19/2008 | P | PASS |
Clint A Smith
|
|
|
Due to landscaping phase most of the BMP's have been removed. Area will being sprayed with a techifier with a seed mix. Will do a final afterwards. CAS #460
|
Conference | 3/20/2008 | 3/20/2008 | 3/20/2008 | A | NR |
Clint A Smith
|
|
|
went over stock pile plans with on-site RP. Will be taking from stockpile then reshaping it . Hydro-seed will be sprayed for finial stabilization. CAS#460
|
Random Inspection | 3/17/2008 | 3/18/2008 | 3/18/2008 | P | FAIL |
Clint A Smith
|
|
|
Silt fence along Market st is in need of repair and re-installation. Will be having a confrence with the Super/ RP tomorrow to go over the SWPPP. CAS#460
|