Site Final | 10/21/2008 | 10/21/2008 | 10/21/2008 | A | PASS |
Clint A Smith
|
|
|
|
Site Final | 6/5/2008 | 6/9/2008 | 6/9/2008 | P | NR |
Clint A Smith
|
|
|
sediment catch in D.I. still at front of lots. CAS #460
|
General Inspection | 6/4/2008 | 6/4/2008 | 6/4/2008 | A | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 5/23/2008 | 5/27/2008 | 5/27/2008 | P | PART |
Clint A Smith
|
|
|
Due to landscaping phase site is alright. BMP's pulled up for this phase of construction. CAS #460
|
Complaint Inspection | 5/22/2008 | 5/22/2008 | 5/22/2008 | P | FAIL |
Clint A Smith
|
|
|
Per complaint from ACHD. 1. Clean up tracking off of street. 2. pickup all trash off of lots. 3. Clean D.I. 4. protect irragation ditch at front of project. Met with the RP over issues and told him to correct imeadiately. Will re-inspect 5/23/08 CAS #460
|
BMP Violation | 3/10/2008 | 3/11/2008 | 3/11/2008 | P | CANC |
James Rogers
|
|
|
See history.. Trash debris through out lots. Trash still present, some progress made since 3/10 inspection. Street, gutter, sidewalk and ally need to be swept. Contacted RP and notified him that sweeping needs to be completed by predicated rain or a stop work order may be issued.
|
BMP Violation | 3/10/2008 | 3/10/2008 | 3/10/2008 | P | FAIL |
James Rogers
|
|
|
See history.. Trash debris through out lots. Contacted RP-Rob at ###-#### about lot trash clean-up, sweeping dirt off sidewalk, street and alley. Told him would re-inspect on Friday AM.
; Phone #: ###-####
|
BMP Violation | 3/10/2008 | 3/10/2008 | 3/10/2008 | A | FAIL |
Clint A Smith
|
|
|
Trash still scattered troughout lots. Discussed with RP (Robert Truax ###-####) over getting trash pick up done immeaditly. He said that it sshould be done by Tuesday. Will have Jim Rodgers inspect on Tuesday 3/11/08. CAS#460 ###-####
|
BMP Violation | 3/7/2008 | 3/7/2008 | 3/7/2008 | P | PART |
Clint A Smith
|
|
|
Cleaned up both alley way and front street. Put in drain inlet protection in the street and alley way. Wattle was installed at front of project and also protecting culvert at front of project. Need to pick up debris around lots. Was told that will be completed by Monday Morning. Will re-inspect on 3/10/08 CAS#460 ###-####
|