Site Final | 10/2/2008 | 10/2/2008 | 10/2/2008 | P | PASS |
Clint A Smith
|
|
|
|
Site Final | 9/26/2008 | 9/30/2008 | 10/1/2008 | P | FAIL |
Clint A Smith
|
|
|
Need to apply a hyrdo seed application with a tachifier not just a hand spread seed mix.
|
Site Final | 9/24/2008 | 9/26/2008 | 9/26/2008 | P | FAIL |
Clint A Smith
|
|
|
Need to stabilize some of the disturbed area. Will re-inspect on 9/30/08
|
General Inspection | 7/28/2008 | 7/28/2008 | 7/28/2008 | P | PART |
Steven Webb
|
|
|
Drop inlets need maintenance. Reviewed procedures to protect water which will be generated during fire line test. Water must be clean prior to discharge into river.
|
Site Preparation | 3/4/2008 | 3/12/2008 | 3/11/2008 | A | PASS |
James Rogers
|
|
|
See history; Phone #: ###-####
|
Site Preparation | 3/4/2008 | 3/4/2008 | 3/4/2008 | P | PASS |
James Rogers
|
|
|
Discussed SWPPP/ESC plan and inspection reports with site RP, Craig Stevens.Did site walk around with Mr. Stevens, CM Company Project Superintendent. Made some minor recommendations concering maintence issues. BMPs installed and modiefied per plan, BMP inspections up-to-date. Ground FX in charge of BMP placements. At this time site is in compliance with Boise City requirements.; Phone #: ###-####
|