Permit Information
Permit NumberESC07-01438
StatusFinaled
Name JOHN SANCHEZ
Site Address 406 S 6TH ST
Project NameDemolition of a warehouse
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final1/6/20101/6/20101/7/2010PCANC
DetailsDave Hannah
Site Final1/6/20101/6/20101/6/2010PPASS
DetailsDave Hannah
DOC - Permit Finaled1/6/20101/6/20101/6/2010PPASS
DetailsDave Hannah
Site Final7/13/20097/17/20097/17/2009AFAIL
DetailsClint A Smith
Site is still waiting on requirements to acheive final stabilization.
Conference7/13/20097/13/20097/13/2009PFAIL
DetailsClint A Smith
Left a message with RP to contact the city with what action will be taken to stabilize the lot. And when will it occur.
Random Inspection7/13/20097/13/20097/13/2009PPART
DetailsSteven Webb
Site secure but bare dirt remains. Inspector 460 will follow up with RP from July 1, 2009 conference. Recommend to tack and in the fall hydroseed.
Random Inspection7/1/20097/1/20097/1/2009PFAIL
DetailsClint A Smith
Discussed with RP over final stabilization needing to occur soon. He said he will get back to the city soon with a plan of attack.
General Inspection4/29/20094/29/20094/29/2009PPART
DetailsSteven Webb
Provided overview of the necssary requirments to the RP for the site. Should project be terminated site stabilization will be needed and debris removed.
Tracking Control3/23/20093/24/20093/24/2009APASS
DetailsSteven Webb
Follow up: All items as requested are in place, includig rock entrance and storm drain protection.
BMP Violation3/20/20093/23/20093/23/2009APART
DetailsSteven Webb
Follow up: Inserts in place, rock entrance in place. Verbal to RP that additional rock is needed prior to forecasted rain from ashalt to start of existing rock, appr. 8 feet, if not this low area will become very muddy and cause trackout issues. Will follow up
BMP Violation3/20/20093/20/20093/20/2009PFAIL
DetailsSteven Webb
Verbal to RP: no storm drain protection or construction entrance. Hauling out material. Will follow up on Monday.
General Inspection6/11/20086/11/20086/11/2008PDONE
DetailsClint A Smith
Demo complete but soil has not been stabilized for a final.
CAS
#460