Permit Information
Permit NumberESC07-01472
StatusFinaled
Name CHRIS MASON
Site Address 1771 N WILDWOOD ST
Project NameAMBLESIDE SUB 1
Customer Number 
ePlanReview 
Description
Master plan
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection4/11/20114/11/20114/11/2011 DONE
DetailsClint A Smith
DOC - Permit Finaled4/11/20114/11/20114/11/2011PPASS
DetailsClint A Smith
Aging Inspection2/8/20112/8/20112/8/2011 PASS
DetailsJim Johnson
Aging Inspection11/29/201011/29/201011/29/2010 DONE
DetailsJack Frank
Aging Inspection9/29/20109/29/20109/29/2010 FAIL
DetailsClint A Smith
Left message with RP to contact me with the time frame when they will be initiating final stabilization measures to achieve a pass on a site final.
Conference7/23/20107/26/20107/26/2010PDONE
DetailsSteven Webb
1:30 with Ted Mason (Sub-division), ready to final. Ok to remove old silt fence but since their remains two areas that are bare the permit cannot be finaled. Ok to remove most of the drop inlet protections except area that was stockpile soils. EPA permit will remain open because T. M. Company developed and will build the structures inside the development. Informed Ted to continue to comply with the provisions of the local ordinance and the CGP.
Aging Inspection7/5/20107/5/20107/6/2010 CANC
DetailsSteven Webb
BMP Violation3/31/20094/3/20094/3/2009APASS
DetailsClint A Smith
BMP Violation3/31/20093/31/20093/31/2009PFAIL
DetailsClint A Smith
Correction Notice:
Clean up all concrete washout at the left of the vertical construction.
2.Maintain and repair silt fence along the south side of project.
3. Prior to next puor date to maintain concrete washout pt area.
Will re-inspect on 04/03/09PM.
General Inspection1/26/20091/26/20091/26/2009APASS
DetailsEric Strole
Tracking Control1/16/20091/20/20091/20/2009APASS
DetailsEric Strole
Tracking Control1/16/20091/16/20091/16/2009PFAIL
DetailsEric Strole
left verbal correction with rp to clean tracking, dirt & debris of all hard surfaces & maintain di box.
BMP Violation1/5/20091/9/20091/9/2009APART
DetailsClint A Smith
Previous issue were addressed and corrected.
(left message with the RP)
Called to verify that a sweeper was on schedule here it the near future to sweep up all sediment that has been generated on the streets. Talked with the concrete company to scrape up the street where they caused tracking from foot traffic. Cleaning up during inspection.
BMP Violation1/2/20091/5/20091/5/2009ADONE
DetailsClint A Smith
Due to snow fall, I was unable to inspect the mortar mix area. Will re-inspect on 1/9/09
BMP Violation12/31/20081/2/20091/2/2009AFAIL
DetailsSteven Webb
Verbal to RP and Chris M. Mortal tracking on hard surfaces are observed. Need to have washout pits fro mortal mixers. As well RP listed on permit is not the rp, need to send S. Webb the name of the current RP. Left voice mail for Chris and to please contact me.
BMP Violation12/30/200812/31/200812/31/2008PFAIL
DetailsClint A Smith
All exsisting BMP's have been maintained but the stock pile have not been protected at this time. Will re-inspect on 1/2/09
BMP Violation12/30/200812/30/200812/30/2008PFAIL
DetailsClint A Smith
Vebal Correction (left message with RP)
1. Maintian BMP's on site.
2. Install BMP's to protect stock pile next to morter mixer.
3. Clean up spoils piles and debris of morter mix residual.
Will re-inspect on 12/31/08 PM.
BMP Violation10/2/200810/3/200810/3/2008APASS
DetailsClint A Smith
General Inspection10/3/200810/3/200810/3/2008APART
DetailsSteven Webb
Reviewed site with esc contractor and RP. Verbal correction including tracking controls, non-stormwater (oil on pavement), permeter control and that internal stormdrain D. I.'s need to be closed off until surfaces are stabilzed.
General Inspection10/2/200810/2/200810/2/2008PFAIL
DetailsClint A Smith
Correction Notice.
1. Clean up all sediment and debris off of ALL hard surfaces.
2. Protect the drain inlet at the east end of project and the one at the north end of project.
3. Protect any stock piles and slopes not protected with a bmp for sediment and or erosion protection.
Left a message with the RP over the issues to have them correct by 10/2/08 or a stop work order will be issued. Will re-inspect on 10/3/08.
General Inspection8/20/20088/20/20088/20/2008PPART
DetailsBob Reichert
looked ok
BMP Violation7/14/20087/18/20087/18/2008PPART
DetailsClint A Smith
gutter pans clean, but minor tracking due tolandscaping.
CAS
General Inspection7/11/20087/14/20087/14/2008AFAIL
DetailsClint A Smith
Spoke with Project manager (Chris Mason) sincethe RP is on vacation.
Need to clean up gutterpan off all sediment and debris.
Protech 1 d.i. at the south west end of project. Will re-inspect on 7/18/08
CAS
General Inspection7/11/20087/11/20087/11/2008AFAIL
DetailsClint A Smith
Interior streets are paved. D.I. are protected. Crews are sweeping up sidewalks and gutter pans. Will re-inspect on 7/14/08
CAS
Random Inspection4/16/20084/16/20084/16/2008AFAIL
DetailsClint A Smith
Need to stabilize stockpiles on project.
Also need to clean up gutter pan along Shamrock.
Left a message with the RP.
CAS
#460
Tracking Control3/4/20083/7/20083/7/2008PPART
DetailsClint A Smith
Installed a pool where entrance would be so no entrance needed. They have a labor that comes and hand sweeps the parking lot after construction on a daily basis or when needed.
CAS#460
Random Inspection3/4/20083/4/20083/4/2008PPART
DetailsClint A Smith
Called RP and instructed that entrance on Shamrock needs to adressed with underlayment and washed rock since they are moving out dirt off of project. Will re-inspect on Friday the the 6th of March.
CAS#460
###-####
Site Preparation12/6/200712/7/200712/7/2007PDONE
DetailsAimee Hughes
Construction has not started yet.