Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberESC07-01478
StatusFinaled
Name SCOTT LARRONDO
Site Address 422 E CAVE CT
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final3/4/20103/5/20103/8/2010PPASS
DetailsTony Young
DOC - Permit Finaled3/8/20103/8/20103/8/2010PPASS
DetailsTony Young
General Inspection1/19/20101/19/20101/19/2010PPASS
DetailsDixie Fellows
SCOTT IS THE CONTACT..SITE IS CLEAN
Site Final8/20/20098/21/20098/24/2009AFAIL
DetailsTroy James
contractor has not removed fabric from gutter drain, contractor will call me when done
Random Inspection8/20/20098/20/20098/20/2009APART
DetailsTroy James
informed contractor to remove fabric filter from gutter box for final inspection
Random Inspection4/28/20094/28/20094/28/2009PPEND
DetailsDixie Fellows
call scott
General Inspection4/10/20094/10/20094/10/2009PPASS
DetailsPat Lass
Random Inspection2/24/20092/24/20092/24/2009APASS
DetailsDaryl Spivey
site has been cleaned up.......no tracking issues........ds
Random Inspection12/31/200812/31/200812/31/2008APART
DetailsDaryl Spivey
Debris on site needs cleaned up..........ds
Tracking Control11/26/200812/2/200812/2/2008APART
DetailsClint A Smith
Tracking Control11/26/200811/26/200811/26/2008AFAIL
DetailsClint A Smith
Verbal Inspection:
Need to clean up tracking with the court.
Will re-inspect on 12/2/08
General Inspection11/5/200811/5/200811/5/2008PPASS
DetailsBob Reichert
looked ok
Tracking Control11/4/200811/4/200811/4/2008PPART
DetailsTony Young
will clean at end of day
Random Inspection10/31/200810/31/200810/31/2008PPASS
DetailsTony Young
will clean up by end of day
BMP Violation10/14/200810/16/200810/16/2008PPASS
DetailsDixie Fellows
follow up on c/n--scott cleaned site
General Inspection10/14/200810/14/200810/14/2008PFAIL
DetailsPat Lass
RP said he would be in compliance by tomorrow.
Tracking Control10/14/200810/14/200810/14/2008PFAIL
DetailsDixie Fellows
BMP Violation10/14/200810/14/200810/14/2008PPEND
DetailsDixie Fellows
follow up on a correction notice posted tues the 14th. rp has until 1:00 today to complete c/n
Tracking Control10/14/200810/14/200810/14/2008PPASS
DetailsDixie Fellows
no return call from scott regarding correction at site..i spoke with clint and posted a c/n giving rp until thurs pm at 1:00 to address issues
Random Inspection10/13/200810/13/200810/13/2008AFAIL
DetailsDixie Fellows
called scott lorrondo with verbal correction--clean all concrete off site--clean debris out of concrete wash-out--need dumpster or garbage container and clean up all garbage on site--need internal and external protection at DI....###-####
Random Inspection9/29/20089/29/20089/29/2008APASS
DetailsClint A Smith
Random Inspection9/26/20089/26/20089/26/2008PPART
DetailsDaryl Spivey
Esc sign was unreadable........researched info and re wrote info on card...also some trash that needs to be cleaned up.........ds
Random Inspection8/12/20088/12/20088/12/2008PPASS
DetailsClint A Smith
BMP Violation7/21/20087/28/20087/28/2008APASS
DetailsClint A Smith
Violation taken care of on Friday the 25th. Everything looks good.
CAS
Tracking Control7/23/20087/25/20087/25/2008PPASS
DetailsClint A Smith
BMP Violation7/21/20087/21/20087/21/2008PFAIL
DetailsClint A Smith
Need to still clean up all hard surfaces of any sediment. Install additional sediment bmp's at front of lot due to the slope being more than a 2% grade. Left message for RP. Will re-inspect on 7/28/08
CAS
#460
BMP Violation7/10/20087/14/20087/14/2008PFAIL
DetailsClint A Smith
Sign not posted at site. Need to clean up all hard surfaces better, free them of sediment.
Smash the the wattle joints together better or overlap. Cannot have gaps between pieces. Spoke with RP and will re-inspect on 7/18/08
CAS
BMP Violation7/10/20087/10/20087/10/2008PFAIL
DetailsClint A Smith
Notice of Correction.
Spoke with the RP, over the pertaining issues.
1. Install all bmp's per erosion control plan and additional along the front of lot.
2. Put up the ESC sign with the proper info.
3. Clean up all sediment and rock chip pile off of the right away.
Will re-inspect on 7/14/08
CAS
460