Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC07-01522
StatusFinaled
Name DAN JAFEK
Site Address 3858 N GARDEN CENTER WAY
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final5/26/20095/26/20095/26/2009APASS
DetailsClint A Smith
Random Inspection5/15/20095/15/20095/15/2009PPASS
DetailsTony Young
Tracking Control3/25/20093/25/20093/25/2009PPASS
DetailsClint A Smith
Tracking Control3/24/20093/25/20093/25/2009AFAIL
DetailsClint A Smith
In process of getting cleaned up. Spoke with RP and was told that it will be done prior to the storm event. Will re-inspect today in the PM.
Random Inspection3/24/20093/24/20093/24/2009AFAIL
DetailsClint A Smith
Verbal to RP:
Clean up all hard surface of all sediment and debris.
Clean up the land bridge at the curb. Will re-inspect on 3/25/09AM.
General Inspection1/26/20091/26/20091/27/2009PPASS
DetailsPat Lass
Scheduled by a contractor via Hello! on 1/26/2009 at 11:49:46 AM. Contact: ###-####.
looks ok
Tracking Control12/30/200812/30/200812/30/2008PPASS
DetailsTony Young
daily cleaning of site
General Inspection12/1/200812/2/200812/2/2008PPART
DetailsClint A Smith
Minor trash clean up around the project area.
General Inspection11/14/200811/14/200811/14/2008APASS
DetailsPat Lass
sign posted and site clean
General Inspection11/12/200811/12/200811/12/2008PFAIL
DetailsClint A Smith
Verbal notice to RP:
1. Clean all hard surfaces of all sediment and debris.
2. Clean up all paint off of gutter pan and dispose of properly.
3. Maintain all construction entrances.
Will re-inspect on 11/14/08.
General Inspection10/16/200810/16/200810/16/2008APASS
DetailsPat Lass
looks good
General Inspection10/15/200810/15/200810/15/2008PPART
DetailsJack Frank
ok
Random Inspection10/7/200810/7/200810/7/2008APASS
DetailsClint A Smith
No issues at the present time.
Random Inspection9/23/20089/23/20089/23/2008APASS
DetailsMike Jordan
Tracking Control9/22/20089/22/20089/22/2008APASS
DetailsTony Young
General Inspection9/17/20089/17/20089/17/2008APART
DetailsEric Strole
spoke with rp about small amount of trash clean up, over all site looks good.
Random Inspection7/14/20087/14/20087/14/2008APART
DetailsClint A Smith
protect perimeter or remove stock pile away from curb.
CAS
460
General Inspection6/19/20086/19/20086/19/2008APASS
DetailsEric Strole
bmp's in order.
Site Preparation5/14/20085/14/20085/14/2008APART
DetailsClint A Smith
Site looks good. All bmps are inplace also with the ESC sign. But the construction entrance needs to be installed still. The Rp said that it will be installed either the end of the day today or tomorrow.

CAS
#460