DOC - Permit Finaled | 6/9/2009 | 6/9/2009 | 6/9/2009 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 10/1/2008 | 10/8/2008 | 10/8/2008 | A | PART |
Clint A Smith
|
|
|
Minor sediment on sidewalks due the grading occuring on site. Will be cleaned up by tomorrow.
|
BMP Violation | 10/2/2008 | 10/3/2008 | 10/3/2008 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 10/1/2008 | 10/2/2008 | 10/2/2008 | A | FAIL |
Clint A Smith
|
|
|
Correction Notice Spoke with RP. IF issues from the prior inspect are not corrected by the end of the day today a STOP WORK ORDER will be issued. 1. Protect the slopes off of Five Mile Rd with a sediment barrier or cut a releif trech at least 6" D by 12" W the length of slope. 2. Clean up all hard surface of sediment and debris through out parking lot. 3. Protect at the South end with some type of sediment protection. Will re-inspect on 10/3/08 in the AM
|
Site Preparation | 9/30/2008 | 10/1/2008 | 10/1/2008 | A | FAIL |
James Rogers
|
|
|
Discussed lack of response by RP with site owner. Notifed them that if issues were not taken care of by end of shift today, a stop work order would be issued.
Issues are: Sidewalk, street, and gutter cleanup. Keeping construction site exit and entrance swept as well as sidewalk and gutters. Landscapers are on site and need to keep sidewalks clear of dirt.
|
Tracking Control | 9/23/2008 | 9/30/2008 | 9/30/2008 | A | FAIL |
James Rogers
|
|
|
Landscaping in progress. Left voice mail with RP and notified him that dirt would need to be swept from sidewalk and street by end of day. Will reinspect tomorrow AM.
|
BMP Violation | 9/23/2008 | 9/23/2008 | 9/23/2008 | P | FAIL |
James Rogers
|
|
|
Mud and dirt track out onto Five Mile and MicMillan, mud and dirt on side walk. Silt fence down and not repaired for some time. Discussed issues with site rep Doug. He indicated correct RP should be listed as Pete Wilson at ###-####. Posted new sign showing this information. He indicated deficiencies would be taken care up by end of shift today.
|
BMP Violation | 9/19/2008 | 9/22/2008 | 9/22/2008 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 9/19/2008 | 9/19/2008 | 9/19/2008 | P | FAIL |
Clint A Smith
|
|
|
Left message with Doug Cleagy RP for hte project itll Corey gets back on the 29th of Sept. 1. Need to install perimeter protection on the Mcmillian and five mile side where the slope are higher that 2% grade. Clean all D.I.'s within the project and along the perimter of the project. Will re-inspect on 9/22/08
|
General Inspection | 9/12/2008 | 9/12/2008 | 9/12/2008 | P | DEFR |
Clint A Smith
|
|
|
Refer all additional inspections to ESC08-00267
|
General Inspection | 8/27/2008 | 8/29/2008 | 9/2/2008 | P | CANC |
Clint A Smith
|
|
|
|
General Inspection | 8/21/2008 | 8/27/2008 | 8/27/2008 | A | DEFR |
Clint A Smith
|
|
|
Moved to 8/29/08. CAS
|
General Inspection | 8/25/2008 | 8/25/2008 | 8/26/2008 | P | PART |
Clint A Smith
|
|
|
Still working on grading the project out. If not completed by 8/29/08 futher enforcement will be taken. CAS
|
BMP Violation | 8/20/2008 | 8/21/2008 | 8/21/2008 | A | PART |
Clint A Smith
|
|
|
Rp was updated. And they are in the process of correcting all other issues withthe notice plus the additional issue that I have added. 1. Protect all interior D.I. with inserts and external gravel bags on each side of the D.I.'s. 2. Clean all (exterior and interior) gutterpans of sediment and debris. Will re-inspect on 8/27/08 CAS
|
BMP Violation | 8/19/2008 | 8/20/2008 | 8/20/2008 | P | DEFR |
Clint A Smith
|
|
|
Moved to 8/21/08
|
General Inspection | 8/18/2008 | 8/18/2008 | 8/19/2008 | P | FAIL |
Clint A Smith
|
|
|
Notice of Correction. Change out RP to the RP with day to day conrtol. Update ESC sign with the proper info. Clean up gutter pan on the perimeter of the project. Remove dirt off of the north east part of project where it is over flowing onto the handicap access of the sidewalk. Will re-inspect on 8/20/08. CAS
|
Random Inspection | 6/16/2008 | 6/16/2008 | 6/16/2008 | A | PART |
Jack Frank
|
|
|
site looks ok
|
BMP Violation | 5/21/2008 | 5/21/2008 | 5/21/2008 | A | FAIL |
Clint A Smith
|
|
|
Notice of Correction 1. Install secondary protection on field D.I. correctly. 2. Re-install silt fence per manufactures specs. 3. Provide access control on project perimeter. 4. Install D.I . protection at drain on Five Mile. 5. Clean up tracking onto Five mile road Failure to comply with notice by Friday the 23rd will result in a stop work order. CAS #460
|
BMP Violation | 5/15/2008 | 5/16/2008 | 5/16/2008 | A | PART |
Clint A Smith
|
|
|
Left message for RP. Still need to deal with sign, one entrance and found 2 infeild D.I. that need secondary protection on them. will re-inspect on Monday the 19th. CAS #460
|
BMP Violation | 5/15/2008 | 5/15/2008 | 5/15/2008 | P | CANC |
Clint A Smith
|
|
|
Moved to th 16th.
|
Complaint Inspection | 5/15/2008 | 5/15/2008 | 5/15/2008 | A | FAIL |
Clint A Smith
|
|
|
Contacted Rp over dust issues and also contacted the complaintee over the action that I have taken with the developement company. Also left a message with DEQ to contact me over the violation. CAS #460
|
Complaint Inspection | 5/15/2008 | 5/15/2008 | 5/15/2008 | A | FAIL |
Clint A Smith
|
|
|
Verbal Correction notice. Contacted RP over these issues. 1. Dust control (left a message with DEQ) (BMC 8-17-02.4) 2. No ESC sign Posted (BMC 8-17-02.1 M) 3. Re-install Silt fence per manufactures Specs. (BMC 8-17) 4. Re-stabilize construction entrances. (BMC 8-17-02.1 H) Will re-inspect on Friday the 16th CAS #460
|
Site Preparation | 3/3/2008 | 3/3/2008 | 3/3/2008 | A | PASS |
James Rogers
|
|
|
No active construction activity at this time. Site is grass covered and stable.
|