Site Final | 5/4/2010 | 5/4/2010 | 5/4/2010 | P | PASS |
Tony Young
|
|
|
|
DOC - Permit Finaled | 5/4/2010 | 5/4/2010 | 5/4/2010 | P | PASS |
Tony Young
|
|
|
done
|
Site Final | 2/25/2010 | 2/25/2010 | 3/1/2010 | A | NR |
Tony Young
|
|
|
|
Site Final | 2/26/2010 | 2/26/2010 | 2/26/2010 | P | NR |
Tony Young
|
|
|
|
Conference | 2/25/2009 | 2/25/2009 | 2/25/2009 | A | PEND |
Dixie Fellows
|
|
|
call jim mckenzie for job info---called jamie and left a message to call me for job info
|
Random Inspection | 11/5/2008 | 11/5/2008 | 11/5/2008 | P | PASS |
Tony Young
|
|
|
|
General Inspection | 10/28/2008 | 10/28/2008 | 10/28/2008 | P | PASS |
Pat Lass
|
|
|
looks ok
|
Random Inspection | 10/28/2008 | 10/28/2008 | 10/28/2008 | P | PASS |
Dixie Fellows
|
|
|
site clean
|