Site Final | 1/7/2009 | 1/7/2009 | 1/7/2009 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 6/11/2008 | 6/11/2008 | 6/11/2008 | P | DONE |
Jim Storey
|
|
|
|
Random Inspection | 6/6/2008 | 6/6/2008 | 6/10/2008 | A | CANC |
Jim Storey
|
|
|
|
General Inspection | 5/28/2008 | 5/28/2008 | 5/28/2008 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 5/13/2008 | 5/13/2008 | 5/13/2008 | P | PASS |
Jim Storey
|
|
|
The data has been moved to a Word document attached to this case.
|
Random Inspection | 5/12/2008 | 5/12/2008 | 5/12/2008 | A | PASS |
Jim Storey
|
|
|
genral conformance maintaned.
|
General Inspection | 5/9/2008 | 5/9/2008 | 5/9/2008 | A | PASS |
Eric Strole
|
|
|
BMPs in order
|
Site Preparation | 3/17/2008 | 3/18/2008 | 3/18/2008 | A | PART |
Clint A Smith
|
|
|
Discussed with RP over protecting storm drain in the middle of lot, post sign at front of project area and to contain all trash debris in a container of some sort. CAS#460
|