Site Final | 4/28/2008 | 5/6/2008 | 5/6/2008 | A | PASS |
James Rogers
|
|
|
|
Site Final | 4/14/2008 | 4/29/2008 | 4/28/2008 | A | FAIL |
James Rogers
|
|
|
|
Site Final | 4/8/2008 | 4/15/2008 | 4/14/2008 | A | FAIL |
James Rogers
|
|
|
|
Site Final | 4/2/2008 | 4/9/2008 | 4/8/2008 | A | FAIL |
James Rogers
|
|
|
Fine grading completed, no sod or grass
|
Site Final | 4/2/2008 | 4/9/2008 | 4/2/2008 | A | FAIL |
James Rogers
|
|
|
No Landscaping
|
Site Final | 3/17/2008 | 3/17/2008 | 3/17/2008 | A | FAIL |
James Rogers
|
|
|
Site not stabilized - no landscaping; Phone #: ###-####
|
BMP Violation | 2/22/2008 | 2/25/2008 | 2/25/2008 | A | PASS |
Clint A Smith
|
|
|
For the most part the area was cleaned up. Sediment barrier was placed at front of lot. Sign was also posted at front of lot. Additional cheverons are place in the gutter to catch sediment that can travel down the gutter pan. CAS#460 ###-####
|
BMP Violation | 2/22/2008 | 2/22/2008 | 2/22/2008 | P | FAIL |
Clint A Smith
|
|
|
**Notice Of Correction** No ESC permit Posted Tacking off of Lot onto street. No sediment BMP's in place Illeagal discharge of turbid water into stormdrain system. Failure to comply will result in a stop work order. Will re-inspect on 2-25-08 PM CAS #460 ###-####
|