Site Final | 6/5/2008 | 6/5/2008 | 6/5/2008 | P | PASS |
Tony Young
|
|
|
|
General Inspection | 6/3/2008 | 6/3/2008 | 6/3/2008 | P | PASS |
Pat Lass
|
|
|
corrections appear to have been made
|
BMP Violation | 3/26/2008 | 3/27/2008 | 3/27/2008 | P | PASS |
Clint A Smith
|
|
|
Everything has been address on the correction notice. Site looks good. Rp has been updated. CAS#460
|
Random Inspection | 3/26/2008 | 3/26/2008 | 3/26/2008 | P | FAIL |
James Rogers
|
|
|
Listed RP, Craig Cooper at ###-#### stated he is not the RP on this site. He did the excavation, but is no longer responsible for site BMP's. Correction notice issued. Discussed site with Builder, Mark Larson, ###-####. Told him a Stop Work Order would be issued PM, 3-27 if a new RP was not designated. Notified Steve Webb.; Phone #: ###-####
|