Site Final | 7/16/2009 | 7/16/2009 | 7/16/2009 | P | PASS |
Eric Strole
|
|
|
|
Random Inspection | 8/13/2008 | 8/13/2008 | 8/13/2008 | A | PART |
Jim Storey
|
|
|
permit isued prior to 5/1/08 esc insp. resposablity/ subdivion clean up and sprinkler water isues in back of sub pending.
|
General Inspection | 7/16/2008 | 7/16/2008 | 7/16/2008 | A | PART |
Mike Kinnear
|
|
|
no sign posted called rp site ok di installed & concrete area washout
|
BMP Violation | 3/28/2008 | 3/31/2008 | 4/1/2008 | P | PART |
Clint A Smith
|
|
|
Set-up a trash container. Still have debis that needs to be placed into the container. Also sediment needs to be cleaned up in gutter pan and street. Contacted RP and told him the issues. CAS #460
|
Random Inspection | 3/28/2008 | 3/28/2008 | 3/28/2008 | P | FAIL |
Clint A Smith
|
|
|
No container for trash debris. Also heavy sediment in the gutter pan and street area. Informed the RP that if a concrete pour is coming up to have a concrete washout pit or a container for them to washout in. Will re-inspect on Monday. CAS #460
|
Site Preparation | 3/10/2008 | 3/10/2008 | 3/10/2008 | P | FAIL |
Steven Webb
|
|
|
Inspected on March 6, 2008. Large amount of mud trackout onto Boise Aven. Informed RP that measures must be in place to reduce trackout and other measures per permit conditions.
|