Site Final | 9/1/2009 | 9/1/2009 | 9/1/2009 | A | PASS |
Doug A Poedy
|
|
|
|
Site Final | 9/1/2009 | 9/1/2009 | 9/1/2009 | A | PASS |
Doug A Poedy
|
|
|
|
General Inspection | 7/21/2009 | 7/21/2009 | 7/21/2009 | P | PASS |
Doug A Poedy
|
|
|
Site looks great.
|
Random Inspection | 2/17/2009 | 2/17/2009 | 2/17/2009 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/1/2008 | 12/2/2008 | 12/2/2008 | P | PART |
Clint A Smith
|
|
|
Minor trash clean up around the project area.
|
General Inspection | 11/12/2008 | 11/12/2008 | 11/12/2008 | P | FAIL |
Clint A Smith
|
|
|
Verbal notice to RP: 1. Clean all hard surfaces of all sediment and debris. 2. Clean up all paint off of gutter pan and dispose of properly. 3. Maintain all construction entrances. Will re-inspect on 11/14/08.
|
Random Inspection | 10/23/2008 | 10/23/2008 | 10/23/2008 | P | PASS |
Clint A Smith
|
|
|
No issues at the present time
|
Site Preparation | 9/29/2008 | 9/29/2008 | 9/29/2008 | P | PASS |
Tony Young
|
|
|
|