Site Final | 2/4/2009 | 2/4/2009 | 2/4/2009 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/12/2009 | 1/12/2009 | 1/12/2009 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 12/30/2008 | 12/30/2008 | 12/30/2008 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 12/18/2008 | 12/18/2008 | 12/18/2008 | A | PASS |
Jack Frank
|
|
|
ok landscaping work in progress
|
Random Inspection | 12/9/2008 | 12/9/2008 | 12/9/2008 | P | PART |
Clint A Smith
|
|
|
In landscaping phase. Will be completed soon.
|
General Inspection | 12/3/2008 | 12/3/2008 | 12/3/2008 | A | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 11/14/2008 | 11/14/2008 | 11/14/2008 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Tracking Control | 11/10/2008 | 11/12/2008 | 11/12/2008 | A | PART |
Clint A Smith
|
|
|
|
General Inspection | 11/6/2008 | 11/10/2008 | 11/10/2008 | A | FAIL |
Clint A Smith
|
|
|
Correction Notice: Clean all hard surfaces of sediment and debris. Failure to comply will result in a stop work order. Will re-inspect on 11/12/08 Am
|
Random Inspection | 11/6/2008 | 11/6/2008 | 11/6/2008 | P | FAIL |
Clint A Smith
|
|
|
Need to clean up all sediment off of all hard surfaces by 11/7/08 PM or prior to a storm event. Will re-inspect on 11/10/08 AM.
|
Random Inspection | 11/3/2008 | 11/3/2008 | 11/3/2008 | P | PART |
Tom Arcoraci
|
|
|
di s ok mud and dirt ok
|
General Inspection | 10/31/2008 | 10/31/2008 | 10/31/2008 | A | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 10/28/2008 | 10/28/2008 | 10/28/2008 | A | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
General Inspection | 10/22/2008 | 10/22/2008 | 10/22/2008 | A | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
Random Inspection | 10/20/2008 | 10/20/2008 | 10/20/2008 | P | PART |
Clint A Smith
|
|
|
Need to maintain D.I. next to the south end of the building.
|
BMP Violation | 10/9/2008 | 10/10/2008 | 10/10/2008 | A | PASS |
James Rogers
|
|
|
Stockpile has been covered. Lot of bare soil, but site still under active construction and potential erosion is contained on site.
|
BMP Violation | 10/6/2008 | 10/9/2008 | 10/9/2008 | A | PART |
Clint A Smith
|
|
|
Still need to do additional clean up on the hard surfaces. Protect or Remove stock piles on hard surface. Install external drain inlet protection in the driveway.
|
General Inspection | 10/7/2008 | 10/7/2008 | 10/7/2008 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 10/6/2008 | 10/6/2008 | 10/6/2008 | P | FAIL |
Clint A Smith
|
|
|
Correction Notice. 1. Clean up ALL hard surfaces of ALL sediment and debris. 2. Maintain and/or protect the storm drain at the east end of project. 3. Protect ALL storm drain in the parking lot where concrete work is orruring. Will re-inspect on 10/9/08 AM.
|
General Inspection | 10/6/2008 | 10/6/2008 | 10/6/2008 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 10/3/2008 | 10/3/2008 | 10/3/2008 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 9/19/2008 | 9/19/2008 | 9/19/2008 | A | PART |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 9/19/2008 | 9/19/2008 | 9/19/2008 | P | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
General Inspection | 9/17/2008 | 9/17/2008 | 9/17/2008 | P | PART |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 9/17/2008 | 9/17/2008 | 9/17/2008 | P | PASS |
Mike Jordan
|
|
|
ESC permit sign was posted. general site conditions looked good.
|
Site Preparation | 9/9/2008 | 9/9/2008 | 9/9/2008 | P | PART |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 9/4/2008 | 9/4/2008 | 9/4/2008 | P | PASS |
Mike Jordan
|
|
|
looked ok.
|
Random Inspection | 8/29/2008 | 8/29/2008 | 8/29/2008 | A | PASS |
Mike Jordan
|
|
|
Site is clean,.
|
General Inspection | 8/25/2008 | 8/25/2008 | 8/25/2008 | P | PART |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 8/22/2008 | 8/22/2008 | 8/22/2008 | A | PART |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 8/1/2008 | 8/1/2008 | 8/1/2008 | P | PART |
Tom Arcoraci
|
|
|
RP make reasonable effort
|
Random Inspection | 7/31/2008 | 7/31/2008 | 7/31/2008 | P | PART |
Tom Arcoraci
|
|
|
told rp to keep debris in container and sweep street as needed
|
Random Inspection | 7/30/2008 | 7/30/2008 | 7/30/2008 | P | PASS |
Tom Arcoraci
|
|
|
ok
|
General Inspection | 7/28/2008 | 7/28/2008 | 7/28/2008 | P | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
Random Inspection | 7/25/2008 | 7/25/2008 | 7/25/2008 | P | PART |
Tom Arcoraci
|
|
|
|
Tracking Control | 7/22/2008 | 7/25/2008 | 7/24/2008 | P | FAIL |
Clint A Smith
|
|
|
Verbal Notice. Clean up all hard surfaces of sediment and debris. Will re-inspect on 7/28/08. CAS
|
General Inspection | 7/22/2008 | 7/22/2008 | 7/22/2008 | A | FAIL |
Clint A Smith
|
|
|
Need to sweep up all sediment off of hard surfaces and maintain D.I. at the east end of project area. Spoke with the RP over the issues. Will re-inspect on 7/25/08 CAS #460
|
General Inspection | 6/25/2008 | 6/25/2008 | 6/25/2008 | P | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
General Inspection | 6/23/2008 | 6/23/2008 | 6/23/2008 | P | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
Tracking Control | 6/11/2008 | 6/11/2008 | 6/11/2008 | P | CANC |
Jim Johnson
|
|
|
|
Tracking Control | 6/11/2008 | 6/11/2008 | 6/11/2008 | A | PART |
Jim Johnson
|
|
|
had conversation on tracking control with RP. bmp in place, signage posted
|
Site Preparation | 6/2/2008 | 6/2/2008 | 6/2/2008 | P | PART |
Clint A Smith
|
|
|
Discussed with RP over maintaining washout and sweeping up project area. They will be re-locating there concrete washout area. CAS #460
|
Site Preparation | 5/30/2008 | 5/30/2008 | 5/30/2008 | P | CANC |
Tom Arcoraci
|
|
|
|
General Inspection | 5/15/2008 | 5/15/2008 | 5/15/2008 | A | PASS |
Mike Kinnear
|
|
|
sign posted site entry ok
|