DOC - Permit Finaled | 9/8/2010 | 9/8/2010 | 9/8/2010 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 2/28/2008 | 2/28/2008 | 2/28/2008 | P | PASS |
Clint A Smith
|
|
|
Site has all required BMP's Plan has been ammended for concrete washout placement. Recommend that a stabilized construction parking are be made. Other than the parking area site is good. CAS#460 ###-####
|