Site Final | 8/23/2010 | 8/23/2010 | 8/23/2010 | P | DONE |
Steven Webb
|
|
|
|
DOC - Permit Finaled | 8/23/2010 | 8/23/2010 | 8/23/2010 | P | PASS |
Steven Webb
|
|
|
|
BMP Violation | 3/30/2008 | 3/31/2008 | 3/31/2008 | A | CANC |
Clint A Smith
|
|
|
Talked w/ steve Webb over the issues. They could have been dealt with differently but it is out of my duristiction. Also explained to Dave O'day of the concerns and where the city stands. CAS#460
|
Tracking Control | 3/27/2008 | 3/28/2008 | 3/28/2008 | A | FAIL |
Clint A Smith
|
|
|
Tracking is not cleaned up to meet our standards. Also one of the dams have been removed so a flow of heavy sedimintated water is discharging from the construction area where there is disturbed soil. Could not get ahold of the RP but got ahold of John Porter the water master for this Area. Will re-inspect on Monday the 31st. CAS #460
|
Tracking Control | 3/27/2008 | 3/27/2008 | 3/27/2008 | P | PART |
Clint A Smith
|
|
|
Thy have stopped all haul out for the day and have scheduled a sweeper to come trough and sweeping up the street. Will re-inspect tomorrow. CAS #460
|
Site Preparation | 3/27/2008 | 3/27/2008 | 3/27/2008 | P | CANC |
Clint A Smith
|
|
|
Track control OOPS!
|
Site Preparation | 3/17/2008 | 3/18/2008 | 3/18/2008 | A | PART |
Clint A Smith
|
|
|
Sign not posted but will be by the end of today. Creek is blocked off from boise river. Explained to John the super over area of concerns through the progression of construction will call RP and also give him a heads-up. All in all, things look good. CAS#460
|