Permit Information
Permit NumberESC08-00233
StatusFinaled
Name TIMOTHY TOMASKO
Site Address 3359 S FEDERAL WAY
Project Name 
Customer Number 
ePlanReview 
Description
demolition for USA Lube
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final12/16/200812/16/200812/16/2008PPASS
DetailsClint A Smith
General Inspection10/28/200810/28/200810/28/2008PPART
DetailsSteven Webb
Verbal to RP; Storm drain needs protecting and sweeping of dirt on hardscape prior to this weekend when rain is forecasted.
Tracking Control8/19/20088/21/20088/22/2008APASS
DetailsClint A Smith
Tracking Control8/13/20088/19/20088/19/2008ADEFR
DetailsClint A Smith
Moved til 8/21/08
General Inspection8/12/20088/12/20088/13/2008PFAIL
DetailsClint A Smith
Need to do a top dressing of Rock on the entrance off of Federal way. Also Clean up area around the Motor mixer and Make a proper Concrete washout area.
Will re-inspect on 8/19/08. Left a message with RP (Tim T.)
CAS
BMP Violation6/11/20086/12/20086/12/2008PCANC
DetailsClint A Smith
All issues pertaining with the correction notice that was given, have been corrected.
CAS
#460
General Inspection6/11/20086/11/20086/11/2008AFAIL
DetailsClint A Smith
Notice of Correction
1. Install a construction entrance off of Federal way or block it of.
2. Maintain and re-install siltfence on the perimeter of project.
3. Clean up all gutterpans and sidewalks along perimeter of project.
Failure to comply with notice will result in a stop work order. Left a message with RP and gave notice to the Project Super. (JR)
Will re-inspect on 6/12/08 in the PM.
CAS
#460
Random Inspection6/6/20086/6/20086/6/2008AFAIL
DetailsClint A Smith
Need to extend entrance on Findley. Also need to install an entrance off of Federal way. Silt fence on Federal Way needs to be re-installed. Will re-inspect on 6/11/08
CAS
#460
Random Inspection5/21/20085/21/20085/21/2008PPART
DetailsSteven Webb
Need to provide top dressing on consruction entrance, maintance needed on a few bmp's. Stockpile soils at rear of project needs final grading and hydroseeding, (long term).
Random Inspection5/2/20085/2/20085/2/2008PPART
DetailsSteven Webb
Overall site looks in compliance, due to soil types and activities might want to consider adding top dressing to the construction entrance.
Site Preparation4/4/20084/7/20084/8/2008PPASS
DetailsClint A Smith
Perimeter protection installed and Sign posted.
CAS
#460
Site Preparation4/4/20084/4/20084/4/2008PFAIL
DetailsClint A Smith
Work will commence of Monday the 7th. Not BMP's inplace. Sign not posted yet.
Will re-inspect on the 7th.
CAS
#460