Site Final | 1/28/2009 | 1/28/2009 | 1/28/2009 | A | PASS |
Eric Strole
|
|
|
|
General Inspection | 6/3/2008 | 6/3/2008 | 6/3/2008 | A | PASS |
Eric Strole
|
|
|
bmp's in order
|
Random Inspection | 5/29/2008 | 5/29/2008 | 5/29/2008 | A | PART |
Jack Frank
|
|
|
site ok
|
Random Inspection | 5/23/2008 | 5/23/2008 | 5/23/2008 | P | PASS |
Clint A Smith
|
|
|
Swept up site. Project area is clean. CAS #460
|
BMP Violation | 5/7/2008 | 5/7/2008 | 5/7/2008 | P | FAIL |
Clint A Smith
|
|
|
Spoke with RP over the issues of picking up all the trash scattered around the project. Clean the D.I.'s on the project area. put back the bmp's infront of the lot. Will re-inspect on on Friday the 9th. CAS #460
|
Random Inspection | 5/6/2008 | 5/6/2008 | 5/6/2008 | P | PASS |
Alan Hauser
|
|
|
BMPs in place storm drain protected at drivewayy
|
Random Inspection | 4/28/2008 | 5/6/2008 | 5/6/2008 | A | PASS |
James Rogers
|
|
|
|
Random Inspection | 5/2/2008 | 5/2/2008 | 5/2/2008 | P | PASS |
Clint A Smith
|
|
|
Site looks good. Sign posted and trash bin supplied. No problems present. CAS #460
|
Site Preparation | 4/28/2008 | 4/28/2008 | 4/28/2008 | P | PASS |
James Rogers
|
|
|
|