Site Final | 2/24/2009 | 2/27/2009 | 2/26/2009 | A | PASS |
Eric Strole
|
|
|
|
Random Inspection | 6/16/2008 | 6/16/2008 | 6/16/2008 | A | PART |
Jack Frank
|
|
|
ok
|
Random Inspection | 6/12/2008 | 6/12/2008 | 6/12/2008 | P | PART |
Jack Frank
|
|
|
site ok
|
Site Preparation | 6/4/2008 | 6/5/2008 | 6/5/2008 | P | PART |
Jack Frank
|
|
|
###-#### sign posted dirt cleaned from gutter called RP he said bmps will be installed soon
|
Site Preparation | 6/4/2008 | 6/4/2008 | 6/4/2008 | A | FAIL |
Jack Frank
|
|
|
called contr will correct I will check back 06-05-08, needs card posted bmps in place and clean dirt from gutter
|
Site Preparation | 6/4/2008 | 6/5/2008 | 6/4/2008 | P | CANC |
Jack Frank
|
|
|
###-####
|
Random Inspection | 5/6/2008 | 5/6/2008 | 5/6/2008 | P | PEND |
Jim Sly
|
|
|
Preliminary inspection at footing pour......Called contr. (Gary) and advised.......No sign.....dirt on street.......Concrete pump truck leaked and absorbtion material applied (not removed from site yet).
|