Site Final | 3/20/2009 | 3/20/2009 | 3/20/2009 | A | PASS |
Bill VanDegrift
|
|
|
complete
|
Random Inspection | 9/15/2008 | 9/15/2008 | 9/15/2008 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 9/15/2008 | 9/15/2008 | 9/15/2008 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 9/9/2008 | 9/9/2008 | 9/9/2008 | A | PART |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 8/1/2008 | 8/1/2008 | 8/1/2008 | P | PART |
Bob Reichert
|
|
|
called rp, called structural, asked about dust, ok
|
Site Preparation | 7/31/2008 | 7/31/2008 | 7/31/2008 | A | PASS |
Mike Jordan
|
|
|
sign posted. bmps in plae.
|
General Inspection | 7/25/2008 | 7/25/2008 | 7/25/2008 | A | PASS |
Mike Kinnear
|
|
|
|
Random Inspection | 7/23/2008 | 7/23/2008 | 7/23/2008 | A | PART |
Tom Arcoraci
|
|
|
|