Site Final | 11/10/2010 | 11/10/2010 | 11/10/2010 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 11/10/2010 | 11/10/2010 | 11/10/2010 | P | PASS |
Dave Hannah
|
|
|
|
Aging Inspection | 11/10/2010 | 11/10/2010 | 11/10/2010 | | PASS |
Dave Hannah
|
|
|
|
Random Inspection | 6/6/2008 | 6/6/2008 | 6/6/2008 | P | PART |
Steven Webb
|
|
|
Stockpile topsoil on hard surface without protection. Informed D. Selvage (RP off work). Said he will get it protected.
|
Site Preparation | 4/25/2008 | 4/29/2008 | 4/29/2008 | A | PASS |
Clint A Smith
|
|
|
All intial BMP's in place. D.I. protected at front of project entrance. Sign posted at construction entrance. PASS CAS #460
|