Site Final | 7/8/2008 | 7/22/2008 | 7/22/2008 | A | PASS |
Clint A Smith
|
|
|
Site stabilized. All work is completed. CAS
|
Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 7/11/2008 | 7/11/2008 | 7/11/2008 | P | PART |
Mike Kinnear
|
|
|
no sign posted site looks fine
|
Site Preparation | 6/30/2008 | 7/8/2008 | 7/8/2008 | A | PASS |
James Rogers
|
|
|
|
General Inspection | 6/30/2008 | 6/30/2008 | 6/30/2008 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Site Preparation | 6/16/2008 | 6/25/2008 | 6/30/2008 | A | PASS |
James Rogers
|
|
|
|
General Inspection | 6/18/2008 | 6/18/2008 | 6/18/2008 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Site Preparation | 6/16/2008 | 6/16/2008 | 6/16/2008 | P | PASS |
James Rogers
|
|
|
RP ####-####
|
Site Preparation | 6/3/2008 | 6/3/2008 | 6/3/2008 | A | PART |
Tom Arcoraci
|
|
|
informed rp to remove dirt from sidewalk
|
Site Preparation | 5/30/2008 | 5/30/2008 | 5/30/2008 | P | NR |
Clint A Smith
|
|
|
Work has not begun. Discussed with RP over the project and told him the steps he will need to take. CAS #460
|