Permit Information
Permit NumberESC08-00369
StatusFinaled
Name DANIEL APPEL
Site Address 1708 S TOLUKA WAY
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final10/16/200810/16/200810/16/2008PPASS
DetailsDave Hannah
DOC - Permit Finaled10/16/200810/16/200810/16/2008PPASS
DetailsDave Hannah
General Inspection10/9/200810/9/200810/9/2008PPASS
DetailsJack Frank
site looks ok landscaping work almost complete
General Inspection9/29/20089/29/20089/29/2008 PASS
DetailsDaryl Spivey
all bmp's in place and concrete dump installed ok..............ds
BMP Violation8/27/20088/29/20088/28/2008ACANC
DetailsClint A Smith
Tracking Control8/19/20088/26/20088/27/2008APASS
DetailsClint A Smith
Random Inspection8/25/20088/25/20088/25/2008PPASS
DetailsClint A Smith
Random Inspection8/13/20088/20/20088/19/2008APASS
DetailsJames Rogers
Site looks good.
Random Inspection8/5/20088/12/20088/13/2008ACANC
DetailsJames Rogers
Random Inspection8/11/20088/11/20088/11/2008PPASS
DetailsClint A Smith
Site kept clean. No issues present.
CAS
General Inspection8/6/20088/6/20088/6/2008PPASS
DetailsMike Kinnear
sign posted site looks fine
Random Inspection7/29/20088/6/20088/5/2008APART
DetailsJames Rogers
Met RP, Daniel at ###-#### on site and discussed possibility of significant erosion coming off driveway area if we get predicated thunderstorms this week. He indicated he would keep eye on weather and take necessary action.
Random Inspection7/9/20087/23/20087/29/2008APASS
DetailsJames Rogers
Site Preparation7/2/20087/9/20087/9/2008APASS
DetailsJames Rogers
Tracking Control7/3/20087/7/20087/7/2008APASS
DetailsClint A Smith
Cleaned up all sediment off the hard surfaces.
CAS
460
Tracking Control7/2/20087/3/20087/3/2008PPART
DetailsClint A Smith
In the process of cleaning up the sediment off of the hard surface.
CAS
460
Tracking Control7/2/20087/2/20087/2/2008PFAIL
DetailsClint A Smith
Nee to clean up all sedin=ment coming off of entrance by the end of today. Also re construct entrance by end of the day tomorrow. Will re-inspect on 6/3/08.
CAS
460
Site Preparation6/24/20087/2/20087/2/2008APART
DetailsJames Rogers
see previous inspection. Talked to Daniel about making sure excavators understand about sweeping construction site entrance and corner of Toluka and Windsong.
Site Preparation6/24/20086/27/20086/27/2008PPART
DetailsClint A Smith
All perimeter bmp will be installed by the end of the day.
CAS
460
Site Preparation6/24/20086/24/20086/24/2008PFAIL
DetailsJames Rogers
1. ESC BMP's to be placed behind sidewalk to prevent soil from getting on street.
2. Concrete washout area (lined) to be placed on site. No further concrete to be placed until this BMP is completed.
3. Consgtruction site entrance to be constructed using approved BMPs. Trackout on sidewalk and street to be swept.
4. DI protection to be placed on Windsong, downstream from site.
Work to be completed no later than close of b usiness on 6-27-08 or a stop work order will be issued.
Site Preparation6/24/20086/24/20086/24/2008APART
DetailsDave Hannah
called rp they will come out and install erosion controll
Site Preparation6/5/20086/10/20086/10/2008ANR
DetailsClint A Smith
No work has started yet.
CAS
#460
Site Preparation6/5/20086/10/20086/10/2008ACANC
DetailsClint A Smith
Duplicate.