Site Final | 10/16/2008 | 10/16/2008 | 10/16/2008 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 10/16/2008 | 10/16/2008 | 10/16/2008 | P | PASS |
Dave Hannah
|
|
|
|
General Inspection | 10/9/2008 | 10/9/2008 | 10/9/2008 | P | PASS |
Jack Frank
|
|
|
site looks ok landscaping work almost complete
|
General Inspection | 9/29/2008 | 9/29/2008 | 9/29/2008 | | PASS |
Daryl Spivey
|
|
|
all bmp's in place and concrete dump installed ok..............ds
|
BMP Violation | 8/27/2008 | 8/29/2008 | 8/28/2008 | A | CANC |
Clint A Smith
|
|
|
|
Tracking Control | 8/19/2008 | 8/26/2008 | 8/27/2008 | A | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 8/25/2008 | 8/25/2008 | 8/25/2008 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 8/13/2008 | 8/20/2008 | 8/19/2008 | A | PASS |
James Rogers
|
|
|
Site looks good.
|
Random Inspection | 8/5/2008 | 8/12/2008 | 8/13/2008 | A | CANC |
James Rogers
|
|
|
|
Random Inspection | 8/11/2008 | 8/11/2008 | 8/11/2008 | P | PASS |
Clint A Smith
|
|
|
Site kept clean. No issues present. CAS
|
General Inspection | 8/6/2008 | 8/6/2008 | 8/6/2008 | P | PASS |
Mike Kinnear
|
|
|
sign posted site looks fine
|
Random Inspection | 7/29/2008 | 8/6/2008 | 8/5/2008 | A | PART |
James Rogers
|
|
|
Met RP, Daniel at ###-#### on site and discussed possibility of significant erosion coming off driveway area if we get predicated thunderstorms this week. He indicated he would keep eye on weather and take necessary action.
|
Random Inspection | 7/9/2008 | 7/23/2008 | 7/29/2008 | A | PASS |
James Rogers
|
|
|
|
Site Preparation | 7/2/2008 | 7/9/2008 | 7/9/2008 | A | PASS |
James Rogers
|
|
|
|
Tracking Control | 7/3/2008 | 7/7/2008 | 7/7/2008 | A | PASS |
Clint A Smith
|
|
|
Cleaned up all sediment off the hard surfaces. CAS 460
|
Tracking Control | 7/2/2008 | 7/3/2008 | 7/3/2008 | P | PART |
Clint A Smith
|
|
|
In the process of cleaning up the sediment off of the hard surface. CAS 460
|
Tracking Control | 7/2/2008 | 7/2/2008 | 7/2/2008 | P | FAIL |
Clint A Smith
|
|
|
Nee to clean up all sedin=ment coming off of entrance by the end of today. Also re construct entrance by end of the day tomorrow. Will re-inspect on 6/3/08. CAS 460
|
Site Preparation | 6/24/2008 | 7/2/2008 | 7/2/2008 | A | PART |
James Rogers
|
|
|
see previous inspection. Talked to Daniel about making sure excavators understand about sweeping construction site entrance and corner of Toluka and Windsong.
|
Site Preparation | 6/24/2008 | 6/27/2008 | 6/27/2008 | P | PART |
Clint A Smith
|
|
|
All perimeter bmp will be installed by the end of the day. CAS 460
|
Site Preparation | 6/24/2008 | 6/24/2008 | 6/24/2008 | P | FAIL |
James Rogers
|
|
|
1. ESC BMP's to be placed behind sidewalk to prevent soil from getting on street. 2. Concrete washout area (lined) to be placed on site. No further concrete to be placed until this BMP is completed. 3. Consgtruction site entrance to be constructed using approved BMPs. Trackout on sidewalk and street to be swept. 4. DI protection to be placed on Windsong, downstream from site. Work to be completed no later than close of b usiness on 6-27-08 or a stop work order will be issued.
|
Site Preparation | 6/24/2008 | 6/24/2008 | 6/24/2008 | A | PART |
Dave Hannah
|
|
|
called rp they will come out and install erosion controll
|
Site Preparation | 6/5/2008 | 6/10/2008 | 6/10/2008 | A | NR |
Clint A Smith
|
|
|
No work has started yet. CAS #460
|
Site Preparation | 6/5/2008 | 6/10/2008 | 6/10/2008 | A | CANC |
Clint A Smith
|
|
|
Duplicate.
|