Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberESC08-00373
StatusFinaled
Name HARRY HAUN
Site Address 5873 N COLLISTER DR
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final10/22/200810/22/200810/22/2008APASS
DetailsJack Frank
landscaping complete lot too the north stabilized and grass growing
General Inspection10/21/200810/21/200810/21/2008APASS
DetailsPat Lass
no issues
General Inspection10/17/200810/17/200810/17/2008PPASS
DetailsJack Frank
site ok
Random Inspection9/24/200810/1/200810/1/2008APASS
DetailsJames Rogers
Landscaper on site. Discussed with them about maintaing ESC bmp during landscaping.
Complaint Inspection9/24/20089/24/20089/24/2008PFAIL
DetailsSteven Webb
Noticed work on project had expanded beyond the property line. Area off site contains signs of paint and concrete washout, (no cleanout pit). As well, area is void of vegetation. Call to builder/RP. Will need to regrade and stabilze all denuded soils prior to final on esc and building. Communicated tocomplaintee,
Site Preparation9/16/20089/23/20089/24/2008APASS
DetailsJames Rogers
Minor violations, but site is stable.
Random Inspection8/25/20089/15/20089/16/2008APASS
DetailsJames Rogers
Random Inspection8/11/20088/25/20088/25/2008APART
DetailsJames Rogers
Site has quite a bit of construction debris on it, but cleanup guy is on site and stated he would have it cleaned by tomorrow AM.
Random Inspection7/29/20088/5/20088/11/2008APASS
DetailsJames Rogers
Site Preparation7/14/20087/28/20087/29/2008APASS
DetailsJames Rogers
Random Inspection7/14/20087/14/20087/14/2008PPASS
DetailsPat Lass
looks good
Site Preparation7/7/20087/14/20087/14/2008APASS
DetailsJames Rogers
General Inspection7/8/20087/8/20087/8/2008PPASS
DetailsEric Strole
bmp's in order
Site Preparation7/2/20087/9/20087/8/2008ACANC
DetailsJames Rogers
Site Preparation6/25/20087/7/20087/7/2008APASS
DetailsJames Rogers
Site Preparation7/2/20087/2/20087/2/2008APASS
DetailsJames Rogers
BMP Violation6/25/20086/25/20086/25/2008PPART
DetailsJames Rogers
Discussed getting trash container on site with RP, Harry Haun at ###-####. Posted Stormwater sign. Also discussed informing subs of maintaing site housekeeping.
General Inspection6/9/20086/9/20086/9/2008PPART
DetailsEric Strole
spoke with sewer contractor & he will clean up road & reinstall waddles after backfill is complete, which will be complete by end of the day.
Site Preparation5/22/20085/27/20085/27/2008PCANC
DetailsClint A Smith
already completed.
Site Preparation5/22/20085/22/20085/22/2008PPASS
DetailsPat Lass