Site Final | 6/6/2008 | 6/6/2008 | 6/6/2008 | P | PASS |
Clint A Smith
|
|
|
All demo work is complete and parking lot will be starting within 30 days. CAS #460
|
Tracking Control | 5/23/2008 | 5/23/2008 | 5/23/2008 | P | PASS |
Clint A Smith
|
|
|
Tracking cleaned up off of streets. CAS #460
|
Site Preparation | 5/23/2008 | 5/23/2008 | 5/23/2008 | A | PART |
Clint A Smith
|
|
|
Sign posted. Also saw tracking occuring off of lot on to street. Told RP to get it cleaned up and not to allow vechiles to pull onto lots due to how saturated to soil is. Will re-inspectat the end of the day to see how the clean up was with tracking. CAS #460
|