Site Final | 10/1/2008 | 10/1/2008 | 10/1/2008 | P | PASS |
Jim Sly
|
|
|
Ray ###-####
|
General Inspection | 9/26/2008 | 9/26/2008 | 9/26/2008 | P | PASS |
Alan Hauser
|
|
|
street cleaned, in process of laying sod
|
General Inspection | 9/25/2008 | 9/25/2008 | 9/25/2008 | P | PASS |
Alan Hauser
|
|
|
process of fine grading, construction materials picked up, in process of finishing up yard
|
Random Inspection | 9/9/2008 | 9/9/2008 | 9/9/2008 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 9/8/2008 | 9/8/2008 | 9/8/2008 | P | FAIL |
Jack Frank
|
|
|
corrections not made Clint has been notified and will deal with contractor
|
General Inspection | 9/5/2008 | 9/5/2008 | 9/5/2008 | A | FAIL |
Jack Frank
|
|
|
called left message, clean site , drain, gutters and street
|
General Inspection | 9/4/2008 | 9/4/2008 | 9/4/2008 | A | PART |
Eric Strole
|
|
|
site looks ok, small amount of trash on site.
|
Random Inspection | 8/26/2008 | 8/26/2008 | 8/26/2008 | P | PART |
Eric Strole
|
|
|
spoke with apex(water & sewer contractor) about clean up of street & side walk after backfill.
|
Site Preparation | 8/22/2008 | 8/22/2008 | 8/22/2008 | P | PASS |
Jim Sly
|
|
|
Tim Behrman
|