Site Final | 8/9/2012 | 8/9/2012 | 8/9/2012 | A | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 8/9/2012 | 8/9/2012 | 8/9/2012 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 7/9/2012 | 7/9/2012 | 7/9/2012 | | PASS |
Jim Johnson
|
|
|
|
General Inspection | 5/22/2012 | 5/22/2012 | 5/22/2012 | | PASS |
Jim Johnson
|
|
|
|
Site Final | 4/6/2012 | 4/6/2012 | 4/6/2012 | A | FAIL |
Mike Jordan
|
|
|
Final stabalazation not completed. Will also need to stabalized lay down area on lot to the east.
|
Tracking Control | 3/7/2012 | 3/7/2012 | 3/7/2012 | A | PASS |
Mike Jordan
|
|
|
|
Tracking Control | 2/15/2012 | 2/15/2012 | 2/15/2012 | A | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 2/14/2012 | 2/14/2012 | 2/14/2012 | P | PART |
Mike Jordan
|
|
|
Verbal correction notice to RP(left message on cell phone) to clean all silts from hard surfaces and trackout onto emerald. Aslo noted to RP that he needs to be providing additional BMP measures to keep trackout to minimum.
|
General Inspection | 2/7/2012 | 2/7/2012 | 2/7/2012 | P | PART |
Mike Jordan
|
|
|
Verbal correction notice to RP to sweep all silts from hardsurfaces and trackout onto emerald. Provide BMP's around stockpiled materials on hardsurfaces. All corrections to be done by end of work day today. RP noted that he has curtis clean sweep arriving later this afternoon to take care of parkinglot and trackout.
|
General Inspection | 1/26/2012 | 1/26/2012 | 1/26/2012 | A | PASS |
Mike Jordan
|
|
|
|
Tracking Control | 1/10/2012 | 1/10/2012 | 1/10/2012 | A | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 1/9/2012 | 1/9/2012 | 1/9/2012 | A | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 1/6/2012 | 1/6/2012 | 1/6/2012 | P | PART |
Mike Jordan
|
|
|
All issues have been resolved except for the stock piles of excavated materials still on site. Noted to contractor to stabalize stockpiles or have them removed. Will check on progress on 1-9-12.
|
BMP Violation | 12/19/2011 | 12/19/2011 | 12/19/2011 | P | FAIL |
Mike Jordan
|
|
|
All outstanding issues have yet to be resolved. Verbal correction notice to RP to have all issues corrected by 12-21-11 (wed) or a stop work order will be issued.
|
General Inspection | 12/16/2011 | 12/16/2011 | 12/16/2011 | A | PART |
Mike Jordan
|
|
|
Needs to sweep all silts from hard surfaces, clean all drain inlets and establish a construction enterance and provide top dressing at enterance/exit. Also Provide updated info on ESC permit sign and post at proper location. Verbal correction notice was issued.
|
General Inspection | 12/9/2011 | 12/9/2011 | 12/12/2011 | | PASS |
Mike Jordan
|
|
|
|
Tracking Control | 10/24/2011 | 10/24/2011 | 10/24/2011 | P | PASS |
Mike Jordan
|
|
|
|
Tracking Control | 10/19/2011 | 10/19/2011 | 10/19/2011 | P | PASS |
Mike Jordan
|
|
|
|
Tracking Control | 10/14/2011 | 10/17/2011 | 10/18/2011 | P | PART |
Clint A Smith
|
|
|
Spoke with RP and explained that clean up all sediment off of the hard surfaces on a daily basis and to maintain the construction exit when needed.
|
Tracking Control | 10/14/2011 | 10/14/2011 | 10/14/2011 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: CLean up all sediment tracked onto Emerald street heading west towards Five Mile. Also maintain the construction exit. Will re-inspect on 10/17/2011
|
Random Inspection | 10/14/2011 | 10/14/2011 | 10/14/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 10/14/2011 | 10/14/2011 | 10/14/2011 | | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 8/29/2011 | 8/29/2011 | 8/31/2011 | | PASS |
Mike Jordan
|
|
|
Noted that vertical construction is going to start.
|
General Inspection | 7/12/2011 | 7/12/2011 | 7/12/2011 | | DONE |
Clint A Smith
|
|
|
NO activity.
|
Site Final | 5/27/2011 | 5/27/2011 | 5/27/2011 | P | NR |
Steven Webb
|
|
|
No active work but building is not even out of the ground, talked to Inspector 450, 180 day clock is running, if BLD gets expired then the ESC should be expired at the same time. No problems observed.
|
General Inspection | 5/16/2011 | 5/16/2011 | 5/16/2011 | | PASS |
Mike Jordan
|
|
|
|
General Inspection | 2/11/2011 | 2/11/2011 | 2/11/2011 | | DONE |
Clint A Smith
|
|
|
No activity.
|
General Inspection | 12/27/2010 | 12/27/2010 | 12/27/2010 | | PASS |
Mike Jordan
|
|
|
BMP's are still in place. underground plumbing work has been in progress.
|
Aging Inspection | 11/10/2010 | 11/10/2010 | 11/10/2010 | | PASS |
Mike Jordan
|
|
|
BMP's still in place, no vertical construction at this time or any other construction. Job has been on "stanby status". Noted that I spoke with Datum construction and they noted that work would be commencing in the very near future.
|
Aging Inspection | 8/20/2010 | 8/20/2010 | 8/20/2010 | | DONE |
Clint A Smith
|
|
|
Work is at a standstill. Cannot reach RP.
|
BMP Violation | 12/3/2009 | 12/18/2009 | 12/18/2009 | A | CANC |
Clint A Smith
|
|
|
Stabilized
|
General Inspection | 12/3/2009 | 12/3/2009 | 12/3/2009 | P | FAIL |
Clint A Smith
|
|
|
Verbal correction to RP: Due to the inactivity on the site that has exceeded 14 day, city expects that all disturbed soil is temporarly stabilized with a tachifier and or perminately stabilized with a seed, mulch, tachifier mix. If it is not possible to apply one of these two applications, then we expect access control to block off the site to all traffic throughout the time period of inactivity and/ or until the spring time. Will re-inspect in two weeks on 12/18/09AM.
|
Random Inspection | 9/29/2009 | 9/29/2009 | 9/29/2009 | A | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 9/28/2009 | 9/28/2009 | 9/28/2009 | P | PASS |
Mike Jordan
|
|
|
A washout has been provided. All BMP's in place. Const. enetrance is being maintained. ok.
|
Site Preparation | 9/17/2009 | 9/17/2009 | 9/17/2009 | P | PART |
Mike Jordan
|
|
|
Needs to provide conc. washout. RP was notified and noted that it would be completed before the conc. placement.
|
Site Preparation | 9/14/2009 | 9/15/2009 | 9/15/2009 | A | PASS |
Mike Jordan
|
|
|
Construction enterance has been stabalized.
|
Site Preparation | 9/14/2009 | 9/14/2009 | 9/14/2009 | A | FAIL |
Mike Jordan
|
|
|
Wip. Construction enterance has not been stabalized. COntactec RP and gave verbal c/n. Noted that would be done by end of work today.
|
Site Preparation | 8/12/2009 | 8/13/2009 | 8/13/2009 | A | DONE |
Clint A Smith
|
|
|
Went over plan with RP prior to the start of any activity on site. Will re-inspect one all bmp's are implimented.
|
Site Preparation | 11/26/2008 | 12/3/2008 | 12/3/2008 | A | NR |
Clint A Smith
|
|
|
|
Site Preparation | 11/12/2008 | 11/26/2008 | 11/26/2008 | A | PASS |
James Rogers
|
|
|
No work at this time.
|
Site Preparation | 11/4/2008 | 11/11/2008 | 11/12/2008 | A | PASS |
James Rogers
|
|
|
No work at this time.
|
Site Preparation | 10/21/2008 | 11/4/2008 | 11/4/2008 | A | PASS |
James Rogers
|
|
|
No work at this time.
|
Site Preparation | 10/14/2008 | 10/21/2008 | 10/21/2008 | A | PASS |
James Rogers
|
|
|
No current construction.
|
Random Inspection | 10/14/2008 | 10/14/2008 | 10/14/2008 | A | PASS |
James Rogers
|
|
|
No construction at this time.
|
General Inspection | 3/29/2011 | 3/29/2011 | | | |
Mike Jordan
|
|
|
|