Site Final | 11/25/2009 | 11/30/2009 | 12/1/2009 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/10/2009 | 4/10/2009 | 4/10/2009 | A | PASS |
Pat Lass
|
|
|
looks ok
|
General Inspection | 4/9/2009 | 4/9/2009 | 4/9/2009 | A | PASS |
Jack Frank
|
|
|
ok
|
Random Inspection | 4/7/2009 | 4/7/2009 | 4/8/2009 | P | PASS |
Dixie Fellows
|
|
|
per Dixie---site ok
|
General Inspection | 4/7/2009 | 4/7/2009 | 4/7/2009 | A | PASS |
Pat Lass
|
|
|
looks good
|
Random Inspection | 1/12/2009 | 1/13/2009 | 1/13/2009 | A | PASS |
Tony Young
|
|
|
|
General Inspection | 12/24/2008 | 12/24/2008 | 12/24/2008 | A | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 12/19/2008 | 12/19/2008 | 12/19/2008 | P | PASS |
Pat Lass
|
|
|
looks ok
|
Random Inspection | 9/25/2008 | 9/25/2008 | 9/25/2008 | A | PASS |
Clint A Smith
|
|
|
No issues present
|
General Inspection | 8/13/2008 | 8/13/2008 | 8/13/2008 | P | PART |
Mike Jordan
|
|
|
Needs to provide inlet protection on di at nw end of jobsite. Gave RP verbal.
|
General Inspection | 8/5/2008 | 8/5/2008 | 8/5/2008 | P | PART |
Jack Frank
|
|
|
ok
|
Random Inspection | 7/30/2008 | 7/30/2008 | 7/30/2008 | P | PASS |
Tony Young
|
|
|
bmp's are in place
|