General Inspection | 9/17/2008 | 9/17/2008 | 9/17/2008 | | CANC |
Clint A Smith
|
|
|
|
Site Final | 9/2/2008 | 9/2/2008 | 9/2/2008 | A | PASS |
Clint A Smith
|
|
|
All disturbed soil has been stabilized. All temporary bmp's are removed. CAS
|
General Inspection | 9/1/2008 | 9/1/2008 | 9/2/2008 | | DEFR |
Clint A Smith
|
|
|
Moved to a site final. CAS
|
Site Preparation | 6/16/2008 | 6/23/2008 | 6/23/2008 | P | PART |
Clint A Smith
|
|
|
Left message with RP to protect the storm drain out on Vista Ave. CAS #460
|
Site Preparation | 6/13/2008 | 6/16/2008 | 6/16/2008 | A | DONE |
Clint A Smith
|
|
|
Work will not start until 6/22/08 and sign will be posted at that time. Went over the concerns with the RP will re-inspect on 6/23/08 in the PM. CAS #460
|
General Inspection | 8/15/2008 | 8/15/2008 | | | |
Steven Webb
|
|
|
|