Site Final | 9/23/2008 | 9/23/2008 | 9/23/2008 | P | PASS |
James Rogers
|
|
|
|
Site Preparation | 9/16/2008 | 9/23/2008 | 9/23/2008 | A | PASS |
James Rogers
|
|
|
|
General Inspection | 9/10/2008 | 9/10/2008 | 9/10/2008 | | PASS |
Clint A Smith
|
|
|
Site kept clean.
|
General Inspection | 8/26/2008 | 8/26/2008 | 8/28/2008 | | PASS |
Tony Young
|
|
|
|
Tracking Control | 8/6/2008 | 8/11/2008 | 8/11/2008 | P | PASS |
Clint A Smith
|
|
|
Cleaning up on a daily basis, or when needed. CAS
|
Site Preparation | 8/4/2008 | 8/6/2008 | 8/6/2008 | A | PART |
Clint A Smith
|
|
|
Need to keep all hard surfaces clean. If the hard surface is filled with sediment on the next inspection a proper construction entrance will be needed. CAS
|