Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberESC08-00457
StatusFinaled
Name RYAN SMITH
Site Address 1609 S OWYHEE ST
Project Name1609 S OWYHEE ST
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final5/27/20106/2/20106/2/2010PPASS
DetailsTom Arcoraci
Site Final5/26/20105/27/20106/2/2010PPASS
DetailsTom Arcoraci
Site Final5/26/20105/27/20105/27/2010APART
DetailsTom Arcoraci
Random Inspection5/26/20105/26/20105/26/2010PPASS
DetailsTom Arcoraci
General Inspection12/3/200912/3/200912/3/2009PPASS
DetailsBob Reichert
looked ok
General Inspection10/29/200911/2/200911/2/2009PPART
DetailsClint A Smith
Need to clean up any tracking on a daily basis.
Random Inspection10/29/200910/29/200910/29/2009PCANC
DetailsClint A Smith
Duplicate.
Random Inspection10/29/200910/29/200910/29/2009PFAIL
DetailsClint A Smith
Verbal to RP:
Make sure that no tracking occurs from the field area where access is established. Also fill out the ESC sign with all of the proper information. WIll re-inspect on 11/2/09PM.
General Inspection10/27/200910/27/200910/27/2009PPASS
DetailsBob Reichert
looked ok
Random Inspection10/27/200910/27/200910/27/2009APASS
DetailsBill VanDegrift
General Inspection10/23/200910/23/200910/23/2009PPASS
DetailsBob Reichert
looked ok
Random Inspection10/23/200910/23/200910/23/2009PPASS
DetailsTom Arcoraci
Random Inspection10/2/200910/2/200910/2/2009PPART
DetailsBob Reichert
ok
Tracking Control9/14/200910/1/200910/1/2009APASS
DetailsClint A Smith
General Inspection9/30/20099/30/20099/30/2009PPASS
DetailsBob Reichert
looked ok for front of building only
Tracking Control9/10/20099/14/20099/14/2009APART
DetailsClint A Smith
Verbal to RP:
Prior to any activity when utilizing the exit onto Overland road, a top dressing is required of 2 inch or great of some type of washed rock. Also include street sweeping and a laborer to clean up any tracking of any material at the time that it occurs. Will follow up with isssue on 10/01/09 AM.
Tracking Control9/9/20099/10/20099/10/2009AFAIL
DetailsEric Strole
left verbal correction with rp to install an approved construction entrance on overland & clean up dirt & debris off all hard surfaces.
Tracking Control9/9/20099/9/20099/9/2009AFAIL
DetailsEric Strole
left verbal correction with rp to maintain construction entrance & di on overland & clean up tracking & need a concrete washout pit by days end.
General Inspection9/1/20099/1/20099/1/2009PPASS
DetailsBob Reichert
looked ok
General Inspection8/31/20098/31/20098/31/2009PPASS
DetailsBob Reichert
looked ok
Conference8/28/20098/28/20098/28/2009ADONE
DetailsMike Jordan
Per Steve Webb, site adjacent to new school, were old school was demolished will need to be stabalized by Beniton Const. prior to final.
Tracking Control8/25/20098/26/20098/26/2009APASS
DetailsEric Strole
Random Inspection8/25/20098/25/20098/25/2009PFAIL
DetailsEric Strole
left verbal correction with rp to clean up tracking by days end.
Tracking Control8/17/20098/17/20098/17/2009PPASS
DetailsClint A Smith
All provisions in place.
General Inspection8/12/20098/12/20098/12/2009PPASS
DetailsBob Reichert
looked ok
General Inspection8/11/20098/11/20098/11/2009PPASS
DetailsBob Reichert
looked ok
Random Inspection8/10/20098/10/20098/10/2009APASS
DetailsJim Storey
BMP Violation7/29/20098/3/20098/3/2009APASS
DetailsEric Strole
Random Inspection7/29/20097/29/20097/29/2009PFAIL
DetailsEric Strole
Left verbal correction with rp to clean all dirt & debris off sidewalks & tracking onto street by 8-2-09 pm. Will reinspect on 8-3-09 am.
Random Inspection7/29/20097/29/20097/29/2009PPART
DetailsTom Arcoraci
General Inspection7/28/20097/28/20097/28/2009PPASS
DetailsBob Reichert
looked ok
General Inspection7/27/20097/27/20097/27/2009PPASS
DetailsBob Reichert
looked ok
General Inspection7/16/20097/16/20097/16/2009PPASS
DetailsBob Reichert
looked ok
Random Inspection7/9/20097/10/20097/10/2009APART
DetailsTom Arcoraci
Tracking Control6/19/20096/22/20096/22/2009APART
DetailsClint A Smith
Verbal to RP:
Protect d.i. on overland rd on the south side in between Atlantic and Owyhee. Block off access point onto Overland Rd.
Complaint Inspection6/19/20096/19/20096/19/2009PFAIL
DetailsClint A Smith
Verbal to RP:
Clean up all sediment and debris tracked out onto Arcadia out Nez Perce and Overland. will re-inspect on 6/22/09 AM.
BMP Violation6/3/20096/10/20096/10/2009APASS
DetailsClint A Smith
Refer to History.
General Inspection6/9/20096/9/20096/9/2009PPASS
DetailsBob Reichert
looked ok
General Inspection6/5/20096/5/20096/5/2009PPASS
DetailsTom Arcoraci
Random Inspection6/3/20096/3/20096/3/2009PFAIL
DetailsSteven Webb
Verbal to RP: Concrete washout is overflowing, needs sweeping of trackout along Nez Pierce. Complete by the end of the day of 6/8/09. Will follow up.
Random Inspection6/2/20096/2/20096/2/2009PFAIL
DetailsClint A Smith
Verbal to RP:
Maintain concrete washout.
Random Inspection5/20/20095/20/20095/20/2009PPART
DetailsTom Arcoraci
control track out
General Inspection5/7/20095/7/20095/7/2009PPASS
DetailsBob Reichert
looked ok
Random Inspection5/1/20095/1/20095/1/2009APASS
DetailsTom Arcoraci
General Inspection4/30/20094/30/20094/30/2009PPASS
DetailsBob Reichert
looked ok
Random Inspection4/22/20094/22/20094/22/2009PPASS
DetailsTom Arcoraci
Random Inspection4/22/20094/22/20094/22/2009APART
DetailsBill VanDegrift
drying out
General Inspection4/9/20094/9/20094/9/2009PPASS
DetailsBob Reichert
checked with rp regarding track-out, he hires street sweeper, rest i place, too much rain, large mud bog all over site
Random Inspection4/9/20094/9/20094/9/2009PPART
DetailsTom Arcoraci
told rp to control track out
General Inspection4/6/20094/7/20094/7/2009PPART
DetailsEric Strole
site looks pretty good with a small amount of tracking.
Random Inspection4/1/20094/1/20094/1/2009APART
DetailsBill VanDegrift
minor tracking
General Inspection3/31/20093/31/20093/31/2009PPASS
DetailsBob Reichert
looked ok
General Inspection3/24/20093/24/20093/24/2009PPASS
DetailsBob Reichert
looked ok
Random Inspection3/20/20093/20/20093/20/2009PPART
DetailsTom Arcoraci
told rp to clean up track out
General Inspection3/19/20093/19/20093/19/2009APASS
DetailsMike Kinnear
sign posted site looks fine
General Inspection3/16/20093/16/20093/16/2009APASS
DetailsMike Kinnear
sign posted site looks fine
Tracking Control3/10/20093/13/20093/13/2009APART
DetailsBill VanDegrift
minor tracking
Random Inspection3/11/20093/11/20093/11/2009PPART
DetailsTom Arcoraci
needs track out sweeped
General Inspection3/11/20093/11/20093/11/2009APASS
DetailsMike Kinnear
sign posted tracking west & south access cleaned up site looks fine
Random Inspection3/10/20093/10/20093/10/2009APART
DetailsBill VanDegrift
minor tracking south and west access points. called rp.
General Inspection3/2/20093/2/20093/2/2009PPASS
DetailsBob Reichert
looked ok
Random Inspection3/2/20093/2/20093/2/2009PPASS
DetailsTom Arcoraci
General Inspection2/19/20093/2/20093/2/2009APASS
DetailsClint A Smith
Installed a new washout pit.
General Inspection2/27/20092/27/20092/27/2009PPASS
DetailsBob Reichert
looked ok
Random Inspection2/27/20092/27/20092/27/2009PPASS
DetailsTom Arcoraci
Random Inspection2/27/20092/27/20092/27/2009APASS
DetailsTom Arcoraci
Random Inspection2/25/20092/25/20092/25/2009PPART
DetailsTom Arcoraci
reminded rp to comply with clints last visit
General Inspection2/13/20092/19/20092/19/2009ADONE
DetailsClint A Smith
Told RP to correct washout pit and post signage prior to next pour date and/or 3/2/09. Will re-inspect on 3/2/09 AM.
Random Inspection2/18/20092/18/20092/18/2009PPART
DetailsTom Arcoraci
reminded super to comply with last correction by 460
General Inspection2/17/20092/17/20092/17/2009PPASS
DetailsBob Reichert
saw yellow sign, looked ok for general site on west side
General Inspection2/6/20092/13/20092/13/2009APART
DetailsClint A Smith
Imformed the project super due to the RP being ill:
1. Maintain concrete washout.
2. Place signage at both washout pits.
3. Keep up on the good house keeping.
Willnre-inspect on 2/19/09 AM.
General Inspection2/6/20092/6/20092/6/2009PPART
DetailsBob Reichert
looked like mild tracking to street, yellow sign up, 460 will look at later
General Inspection2/4/20092/6/20092/6/2009APART
DetailsClint A Smith
Need to clean up minor tracking off of access of Atlantic st. Also dress up both construction access points for the project.
Will re-inspect on 2/13/09.
General Inspection2/4/20092/4/20092/4/2009APART
DetailsClint A Smith
Verbal discussion with RP:
1. Provide a washout pit next to Mortor mixer area. And clean up all spoils surrounding mixer.
2. Maintain both construction accesses.
3. Clean up all hard surfaces of sediment and debris.
Will re-inspect on 2/6/09 AM.
General Inspection2/2/20092/2/20092/2/2009PPASS
DetailsBob Reichert
looked ok
Tracking Control11/19/200811/19/200811/19/2008APASS
DetailsBill VanDegrift
access controls in place and surfaces look good.
General Inspection11/13/200811/13/200811/13/2008PPASS
DetailsBob Reichert
looked ok
Tracking Control11/6/200811/11/200811/12/2008APASS
DetailsClint A Smith
Tracking Control11/4/200811/6/200811/6/2008APART
DetailsClint A Smith
streets swept up with a vaccum sweeper still looks dirty but is better. all but the entrance on Owyhee was maintained. Will check on 11/11/08 AM to see if there is anymore tracking.
Random Inspection11/5/200811/5/200811/6/2008PPASS
DetailsMike Jordan
ESC permit sign posted. Site clean.
General Inspection11/5/200811/5/200811/5/2008APASS
DetailsMike Kinnear
sign posted site looks fine
Tracking Control11/4/200811/4/200811/4/2008PFAIL
DetailsClint A Smith
Went over the preventitive step to eliminate track out of the project. Told the RP to figure out a way to eliminate the tracking and to clean up tracking off of the surrounding streets. Will re-inspect by 11/6/08 AM
Random Inspection10/30/200810/30/200810/30/2008PPASS
DetailsMike Jordan
ESC permit sign posted. General site conditions were good. Informed contractor to watch track out.
Random Inspection10/24/200810/24/200810/24/2008APASS
DetailsMike Jordan
General Inspection10/15/200810/15/200810/15/2008PPASS
DetailsBob Reichert
looked ok
Random Inspection10/9/200810/9/200810/9/2008PPASS
DetailsMike Jordan
ESC permit sign posted. All BMP's in place. General site conditions were good.
General Inspection10/9/200810/9/200810/9/2008APASS
DetailsBob Reichert
looked ok
General Inspection10/8/200810/8/200810/8/2008PPASS
DetailsClint A Smith
Need to update info with the city and in another RP for the project area and clean up entrance off of Nez Perce and Atlantic.
Random Inspection10/3/200810/3/200810/3/2008PPASS
DetailsJim Storey
General Inspection10/1/200810/1/200810/1/2008PPASS
DetailsBob Reichert
looked ok
BMP Violation10/1/200810/1/200810/1/2008PPASS
DetailsDixie Fellows
construction entrance rock put back in place
General Inspection10/1/200810/1/200810/1/2008APEND
DetailsDixie Fellows
verbal c/n to clean up tracking in street and re-do rock at entrance
General Inspection9/24/20089/24/20089/24/2008APART
DetailsBob Reichert
looked ok
Random Inspection9/24/20089/24/20089/24/2008APART
DetailsMike Jordan
Needs to clean trackout. verbal c/n given to RP.
General Inspection9/16/20089/16/20089/16/2008APART
DetailsMike Kinnear
sign posted t/w rp their esc permit is for multi family building & grouping is messed up he needs get with office to correct this.
Random Inspection9/16/20089/16/20089/16/2008APASS
DetailsJim Storey
General Inspection8/18/20088/20/20088/20/2008ACANC
DetailsClint A Smith
Tracking Control8/18/20088/18/20088/18/2008APASS
DetailsClint A Smith
Site has re-installed construction entrances with large 2-4" crushed rock to due the dirt moving that will be occuring on and off of project. Will be sweeping up all hard surfaces today. Will check up on 8/20/08
CAS
General Inspection8/14/20088/14/20088/14/2008PFAIL
DetailsClint A Smith
Spoke with RP.
1. Stop street washing at the entrance of lot. Clean up all hard surface of sediment.
Will re-inspect on 8/18/08.
Site Preparation7/8/20087/15/20087/15/2008ANR
DetailsClint A Smith
Still working off of the ESC for the utility lines. ESC08-00094
CAS
Site Preparation7/8/20087/8/20087/8/2008PNR
DetailsClint A Smith
work has not begun. Will re-inspect in a week.
CAS