Site Final | 8/25/2008 | 9/15/2008 | 9/15/2008 | A | CANC |
James Rogers
|
|
|
See previous
|
Site Final | 8/25/2008 | 8/25/2008 | 8/25/2008 | P | PASS |
James Rogers
|
|
|
|
Site Final | 8/11/2008 | 8/25/2008 | 8/25/2008 | A | FAIL |
James Rogers
|
|
|
Storm water infltration system still not complete.
|
Site Final | 8/1/2008 | 8/11/2008 | 8/11/2008 | A | FAIL |
James Rogers
|
|
|
Storm runoff infiltration system not complete.
|
Site Final | 8/1/2008 | 8/1/2008 | 8/1/2008 | A | FAIL |
James Rogers
|
|
|
Work on stormwater surface infiltration bed has not been completed. Discussed work with Richard Jordan at ###-#### and he indicated it would be completed within next several weeks.
|
Site Preparation | 7/25/2008 | 7/28/2008 | 7/28/2008 | P | CANC |
Clint A Smith
|
|
|
Woork is almost completed. CAS
|
General Inspection | 7/25/2008 | 7/25/2008 | 7/25/2008 | A | PASS |
Clint A Smith
|
|
|
Work is almost completed. Project does not looks bad. Removed the stop work order sign off of thr telephone post due to the issueing of the ESC permit. CAS
|