Site Final | 1/14/2009 | 1/14/2009 | 1/14/2009 | A | PASS |
Clint A Smith
|
|
|
The verical construction has begun.
|
Conference | 10/13/2008 | 10/13/2008 | 10/13/2008 | A | DONE |
Clint A Smith
|
|
|
Told the Super on site that they will not need any BMP's where the grade will be dropping lower than the surrounding area. TYold them to sweep up the entrances at the end of the day if there is any trace of tracking.
|
Random Inspection | 10/10/2008 | 10/10/2008 | 10/10/2008 | P | PART |
Steven Webb
|
|
|
Overall site looks good, excavation backfilled and contaminated soils have been transported off site. Perimeter controls in place. Needs some maintance and general debris cleanup.
|
General Inspection | 10/1/2008 | 10/3/2008 | 10/3/2008 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/1/2008 | 10/1/2008 | 10/1/2008 | P | PART |
Steven Webb
|
|
|
Status remains the same from the last inspection. Maintanence needed prior to forcasted rain. Will follow up.
|
Complaint Inspection | 9/30/2008 | 9/30/2008 | 9/30/2008 | P | PART |
Steven Webb
|
|
|
Correction to rp in regards to site bmp maintance and additiona bmps prior to forcasted rain by Friday, Oct. 3. Will follow up.
|
Random Inspection | 9/19/2008 | 9/19/2008 | 9/19/2008 | P | PART |
Steven Webb
|
|
|
Site look rather good, could use some maintance and minor sweeping.
|