Site Final | 10/22/2008 | 10/22/2008 | 10/22/2008 | P | DONE |
Bob Archibald
|
|
|
|
DOC - Permit Finaled | | | 10/22/2008 | | PASS |
Bob Archibald
|
|
|
New permit issued for rebuild.
|
BMP Violation | 8/29/2008 | 9/2/2008 | 9/2/2008 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 8/29/2008 | 8/29/2008 | 8/29/2008 | P | FAIL |
Clint A Smith
|
|
|
Notice of Correction. Protect storm drain with approved storm drain protection. Failure to comply will result in a stop work order. Will re-inspect on 09/02/08. CAS
|
Complaint Inspection | 8/28/2008 | 8/28/2008 | 8/28/2008 | P | FAIL |
Clint A Smith
|
|
|
Spoke with the IRP over the Dust isue and explained to him that they must use water surpression whe n excavating the debris in the project. If this problem occurs again, further enforcement will occur. CAS
|
Complaint Inspection | 8/27/2008 | 8/27/2008 | 8/27/2008 | A | FAIL |
Steven Webb
|
|
|
Informed RP to use water for debris dust, protect storm drain drop inlet and to clean up any materials in the street or sidewalk.
|