Site Final | 12/2/2008 | 12/2/2008 | 12/2/2008 | P | PASS |
Clint A Smith
|
|
|
|
Conference | 8/25/2008 | 8/25/2008 | 8/25/2008 | P | DONE |
Clint A Smith
|
|
|
Met with Steve, Tom D. (ACHD) and Wendy (Parks and Rec.) to address the concern of heavy sedimintated water discharging into the outfall into the boise Rive. Told Parks and Rec (Wendy) to use less water for the construction of the roads and or use secondary protection also on the d.i. with in the project area.
|
Site Preparation | 8/7/2008 | 8/7/2008 | 8/7/2008 | P | PASS |
Clint A Smith
|
|
|
|