Site Final | 10/9/2008 | 10/9/2008 | 10/9/2008 | P | PASS |
Alan Hauser
|
|
|
all debris cleaned up and sod is in place, driveway and sidewalk are cleaned.
|
Site Preparation | 10/9/2008 | 10/9/2008 | 10/9/2008 | A | PASS |
Jim Sly
|
|
|
|
General Inspection | 9/30/2008 | 9/30/2008 | 9/30/2008 | P | FAIL |
Jack Frank
|
|
|
corr posted clean dirt from street and sidewalk called
|
General Inspection | 9/26/2008 | 9/26/2008 | 9/26/2008 | P | PART |
Alan Hauser
|
|
|
trash removed and ground ready for final grading, bmp's in place
|
Random Inspection | 9/26/2008 | 9/26/2008 | 9/26/2008 | A | PART |
Jim Johnson
|
|
|
signage posted trash container on site down stream storm drain has bmp installed
|
Random Inspection | 9/12/2008 | 9/12/2008 | 9/12/2008 | P | PASS |
Jim Sly
|
|
|
Raymond Corden
|
Site Preparation | 8/28/2008 | 8/28/2008 | 8/28/2008 | P | PASS |
Jim Sly
|
|
|
Tim Behrman
|